330.2

DEFINITIONS

San Francisco Planning Code · SF Planning Code § 330.2

Corpus is an independent public-information project, not the official City of San Francisco website. Stable reference URL

SEC. 330.2. DEFINITIONS. For the purposes of Sections 330 through 330.16, the following definitions shall apply: (a) An "aggrieved person" for the purpose of appeals to the California Coastal Commission shall be any person who appears at a public hearing in connection with a decision or action appealed to the California Coastal Commission, or who by other appropriate means informed in writing the Zoning Administrator, Planning Commission, or Board of Appeals. (b) "Emergency" is defined as a sudden unexpected occurrence demanding immediate action to prevent or mitigate loss or damage to life, health, property, or essential public services. (c) "Environmentally sensitive habitat" is any area in which plant or animal life or their habitats are either rare or especially valuable because of their special nature or role in an ecosystem and which could be easily disturbed or degraded by human activities and developments. (d) The "Local Coastal Program" shall be the San Francisco Western Shoreline Plan, a part of the City's General Plan, and any of its implementation programs issue papers and any other documents certified by the California Coastal Commission. (e) A "project" shall be any of the following: (1) Construction, reconstruction, demolition or alteration of the size of any building, including any facility of any private, public or municipal utility; (2) Change in the density or intensity of use of land, including but not limited to subdivision(s) and any other division of land, including P lot splits, except where the land is for the purchase of such land by a public agency for public recreational use; (3) The placement, building or construction of any solid material or structure, including but not limited to, any building, road, pipe, flume, conduit, siphon, aqueduct, telephone line, and electrical power transmission and distribution line; (4) Grading, removing, dredging, mining or extraction of any material; (5) Discharge or disposal of any dredged material or of any gaseous, liquid, solid or thermal waste, and the mining or extraction of any material; (6) Change in the intensity or use of a body of water, or stream, or access thereto; (7) The removal or harvesting of major trees, rare or endangered species, and permanently established riparian vegetation other than for agricultural purposes. (Ord. 509-85, App. 11/22/85; amended by Ord. 188-15 , File No. 150871, App. 11/4/2015, Eff. 12/4/2015) AMENDMENT HISTORY Nonsubstantive changes; Ord. 188-15 , Eff. 12/4/2015. SEC. 330.3. PROJECTS EXEMPT FROM COASTAL ZONE PERMIT REVIEW. No Coastal Zone Permit shall be required for the following projects: (a) Enlargement, alteration or reconstruction of any existing single-family residence; (b) Enlargement or alteration of any structure other than a single-family residence or a public structure or facility, provided that these improvements do not have an adverse environmental effect, adversely affect public access, or involve a change in use contrary to any policy of the Local Coastal Program; (c) Repair or maintenance activities that do not result in an addition to, or enlargement or expansion of a structure or use, provided that it does not fall within the requirement in Section 330.4(e), (h), and (i); (d) The replacement of any structure, other than a public structure or facility, destroyed by natural disaster. Such replacement structure shall (1) Conform to applicable Building Code, other standards of this Code and zoning requirements, and other applicable Municipal Code, (2) shall be for the same use as the destroyed structure, (3) shall not exceed either the floor area, height, or bulk of the destroyed structure by more than 10 percent, and (4) shall be sited in the same location on the affected property as the destroyed structure

San Francisco CA 330.2 | Municipal Law | Corpus