§ 15.04.310 — Inspections
Stockton Municipal Code, California (Code 2026-10-13: eCode360 publication current through the 2026-10-13 codification (scraped 2026-11-17)) · Stockton Municipal Code § 15.04.310
Corpus is an independent public-information project, not the official City of Stockton website. Stable reference: corpuslaw.us/code/e7ca8f37-22d0-4dcf-8cef-cd3f1c6a822d
§ 15.04.310: Inspections.
Section R109, Chapter 1, of the California Residential Code and Section 110, Chapter 1, of the California Building Code, 2025 Edition is hereby amended to read. A. General. All construction or work for which a permit is required shall be subject to inspection by the Building Official and all such construction or work shall remain accessible and exposed for inspection purposes until approved by the Building Official. In addition, certain types of construction shall be subject to continuous inspections as specified in Section 15.04.320. Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of these Codes or of other ordinances of the City of Stockton. Inspections purporting to waive or authorize violation of any provisions of these Codes or of other ordinances of the City of Stockton shall be void. It shall be the duty of the permit applicant to cause the work to remain accessible and exposed for inspection purposes. Neither the Building Official nor the City of Stockton shall be liable for any expense entailed in the removal or replacement of any material required to allow inspection. A survey of the lot may be required by the Building Official to verify that the structure is located in accordance with the approved plans. B. Inspection Requests. It shall be the duty of the person doing the work authorized by a permit to notify the Building Official that such work is ready for inspection. The Building Official may require that every request for inspection be filed at least twenty-four (24) hours before such inspection is scheduled. Such request may be online or by telephone at the option of the Building Official. It shall be the duty of the person requesting any inspection required by these Codes to provide access to and means for proper inspection of such work. C. Permit Card. Work requiring a building permit shall not be commenced until the permit holder or their agent shall have posted the official permit record card in a conspicuous place on the front premises and in such a position as approved by the Building Official. This card shall be maintained in such position by the permit holder until final approval has been issued by the Building Official. D. Approvals Required; Conformity with Approved Plans. No work shall be done on any part of the building, structure, or private parking lot beyond the point indicated in each successive inspection without first obtaining the written approval of the Building Official. The Building Official, upon notification, shall make the requested inspections and shall either indicate that portion of the construction is satisfactory as completed or shall notify the permit holder or their agent wherein the same fails to comply with these Codes and the approved plans, specifications, and permit conditions. Any portions which do not comply shall be corrected and such portions shall not be covered or concealed until authorized by the Building Official. Such written approval shall be given only after an inspection shall have been made of each successive step in the construction as indicated by each of the inspections required in subsection E, below. There shall be a final inspection and approval of all buildings and building service equipment when completed and ready for occupancy. E. Required Inspections. Reinforcing steel or structural framework of any part of any building or structure shall not be covered or concealed without first obtaining the approval of the Building Official. The Building Official shall make the following inspections upon notification by the permit holder or their agent providing all other requirements of this section have been met. The Building Official may require additional inspections other than those listed below at his/her discretion. The Building Official shall either approve that portion of the construction as completed or shall notify the permit holder or their agent wherein the same fails to comply with these Codes, the approved plans and specifications, or other permit conditions. 1. Foundation Inspection: To be made after trenches are excavated and forms erected and when all materials for the foundation are delivered on the job. Where concrete is ready mixed in accordance with ASTM C94, the concrete need not be on the job. 2. Concrete Slab or Underfloor Inspection: To be made after all in-slab or underfloor reinforcing steel and building service equipment, conduit, piping accessories, and other auxiliary equipment items are in place, inspected, and approved but before any concrete is poured or floor sheathing installed, including the subfloor. 3. Lowest floor elevation: In flood hazard areas, upon forming of the lowest floor, including the basement, and prior to concrete pour or further vertical construction, the Building Official shall require an elevation certificate certifying the elevation of the lowest floor, including basement. 4. Frame Inspection: To be made after the roof, all framing, fire blocking, and bracing are in place and all pipes, chimneys, and vents are complete and rough electrical, plumbing, heating wires, pipes, and ducts are approved. 5. Insulation Inspection: To be made after all insulation has been installed. 6. Fireplace Inspection: To be made when any masonry fireplace has been constructed to mantel height with reinforcing steel, combustion air openings, and dampers in place. 7. Hollow Concrete Block Masonry: To be made after first block courses are laid up with the first bond beam course steel in place and before bond beam blocks are grouted. 8. Lath and/or Wallboard Inspection: To be made after all lathing and/or wallboard, interior and exterior, is in place but before any plastering is applied or before wallboard joints and fasteners are taped and finished. 9. Weather-Exposed Balcony and Walking Surface Waterproofing Inspection: Where balconies or other elevated walking surfaces have weather-exposed surfaces, and the structural framing is protected by an impervious moisture barrier, all elements of the impervious moisture barrier system shall not be concealed until inspected and approved. 10. Fire and Smoke Resistant Penetrations Inspection: Protection of joints and penetrations in fire-resistance-rated assemblies, smoke barrier and smoke partitions shall not be concealed until inspected and approved. 11. Final Inspection: To be made after all work required by the building permit is complete and the building is ready for occupancy, and public improvements have either been accepted by action of the City Council, or upon application of City Public Works, when the subdivision is otherwise in compliance with all pertinent regulations. If located in a flood hazard area, documentation of the elevation of the lowest floor or the elevation of dry floodproofing, if applicable, shall be submitted to the Building Official prior to final inspection. F. Plumbing, Electrical, Mechanical, and Private Parking Lot Inspections. 1. General: All equipment, systems, or private parking lots for which a permit is required under these codes shall be inspected by the Building Official. No portion of any equipment, system, or private parking lot intended to be concealed by any permanent portion of the building or private parking lot shall be concealed until inspected and approved. When the installation of any equipment or system is complete, a second or final inspection shall be made. Equipment or systems regulated by these codes shall not be connected to the fuel or power supply until authorized by the Building Official. 2. Operation of Equipment: The requirements of this section shall not be considered to prohibit the operation of any equipment or systems installed to replace existing equipment or systems serving an occupied portion of the building if a request for inspection of such equipment or system has been filed with the Department not more than forty-eight (48) hours after such replacement work is completed and before any portion of such equipment or system is concealed by any permanent portion of the building. 3. Final Inspection Revoked: A final inspection approval may, upon notice, be revoked by the Building Official if it is found that the equipment or system fails in any respect to comply with the requirements of these codes, plans, or specifications or that the installation is unsafe, dangerous, or a hazard to life or property. G. Other Inspections. In addition to the called inspections specified above, the Building Official may make or require other inspections of any construction work or of any existing building to ascertain compliance with the provisions of these codes and other laws which are enforced by the Building Official. For the purpose of determining compliance with Section 15.04.040, the Building Official may cause any structure to be inspected. H. Reinspections. A reinspection fee may be assessed for each inspection or reinspection when such portion of work for which inspection is called is not complete or when corrections called for are not made. This subsection is not to be interpreted as requiring reinspection fees the first time a job is rejected for failure to comply with the requirements of these codes, but as controlling the practice of calling for inspections before the job is ready for such inspection or reinspection. Reinspection fees may be assessed when the permit card is not properly posted on the work site, the approved plans are not readily available to the inspector, for failure to provide access on the date for which inspection is requested, or for deviating from plans requiring the approval of the Building Official. To obtain a reinspection, the applicant shall file an application therefore in writing upon a form furnished for the purpose, and pay the reinspection fee in accordance with Section 15.04.280. In instances where reinspection fees have been assessed, no additional inspection of the work will be performed until the required fees have been paid.
( Prior code § 13-305 ; Ord. 026-07 C.S. § 5 ; Ord. 001-11 C.S. § 2, eff. 2-24-11 ; Ord. 2014-03-04-1201-01 C.S. § 2 ; Ord. 2016-11-15-1204-01 § II ; Ord. 2019-11-19-1102-01 § 2 ; Ord. 2022-11-15-1203 C.S. § 2 ; Ord. 2025-11-18-1206 , 11/18/2025 )
Ask a question about Stockton law
Corpus searches the Stockton sections it holds and shows the ones that match, with their citations. Free, no sign-in.
