For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 15.04.320 — Special inspections

Stockton Municipal Code, California (Code 2026-10-13: eCode360 publication current through the 2026-10-13 codification (scraped 2026-11-17)) · Stockton Municipal Code § 15.04.320

Corpus is an independent public-information project, not the official City of Stockton website. Stable reference: corpuslaw.us/code/c5226b64-ca4e-4d39-ae0d-cac2f19c6d01

§ 15.04.320: Special inspections.

In addition to the inspections to be made as specified in Section 15.04.310, the owner or the engineer or architect acting as the owner's agent shall employ one or more approved special inspectors who shall provide the special inspections as follows: A. As specifically required by the Building Official. B. As required by Chapter 17 of the 2025 California Building Code. C. Electrical Special Inspection: In addition to the inspections required by the 2025 California Electrical Code (CEC), electrical special inspection shall be provided for the following items: 1. Installation or alteration of high voltage electrical systems and equipment which fall within the scope of CEC, Article 490. 2. Installation or alteration of that portion of a healthcare facilities electrical system which falls within the scope of CEC, Article 517, including such systems installed in facilities where outpatient surgical procedures are performed (OSHPD 3). 3. Installation or alteration of electrical systems within locations classified as hazardous by provisions of the CEC, except for gasoline dispensing installations and systems located within storage garages, repair garages or lubritoriums. 4. Installation of Critical Operations Power Systems (COPS) which fall within the scope of CEC, Article 708. 5. Installation of Solar Photovoltaic Systems greater than 100 kW which fall within the scope of CEC, Article 690. 6. Installation of unlisted equipment. 7. Where required by the Registered Design Professional in responsible charge for the electrical design.

( Prior code § 13-306 ; Ord. 001-11 C.S. § 2, eff. 2-24-11 ; Ord. 2014-03-04-1201-01 § 2 ; Ord. 2016-11-15-1204-01 § II ; Ord. 2019-11-19-1102-01 § 2 ; Ord. 2022-11-15-1203 C.S. § 2 ; Ord. 2025-11-18-1206 , 11/18/2025 )

Ask a question about Stockton law

Corpus searches the Stockton sections it holds and shows the ones that match, with their citations. Free, no sign-in.