§ 15.48.080 — Additional regulations
Stockton Municipal Code, California (Code 2026-10-13: eCode360 publication current through the 2026-10-13 codification (scraped 2026-11-17)) · Stockton Municipal Code § 15.48.080
Corpus is an independent public-information project, not the official City of Stockton website. Stable reference: corpuslaw.us/code/ce33c607-f51e-4094-8d3d-83cd7f37a11d
§ 15.48.080: Additional regulations.
Construction Activities Involving One Acre or More. Construction activities that disturb one acre or more shall provide for effective control of erosion, sediment, and all other pollutants as required in the CGP. The permit holder shall be responsible for the installation and monitoring of effective erosion and sediment controls. Such controls may be evaluated by the authorized enforcement officer and shall be required to comply with the following provisions. A. Notice of Intent. Construction activities involving one acre or more must file a NOI along with the current filing fee established by the SWRCB, for each construction site, to the SWRCB, A copy of the NOI application and the site's waste discharge identification number (WDID), is issued by the SWRCB, shall be submitted to the City prior to the issuance of a grading permit. B. Stormwater Pollution Prevention Plan. A SWPPP, as required by the CGP, shall be developed and implemented for each construction site. The SWPPP shall incorporate an effective combination of BMPs customized to the site using up-to-date standards and practices as identified in the California BMP Handbooks or equivalent pre-approved by the City. 1. The name, address, email address, and phone number (including a 24-hour emergency phone number) of the person responsible for implementation, inspecting, and reporting of the site SWPPP, shall be provided in writing to the City prior to issuance of a grading permit. The person responsible for the SWPPP shall continue to be available until completion of the project. Any change of such person responsible for the SWPPP shall be filed with the City within 24 hours, by the permit holder. 2. Upon commencement of and during construction activities, a current copy of the SWPPP shall be kept on the construction site and made available to authorized enforcement officers upon request. 3. Best management practices (BMPs) shall be maintained and in place for all areas that have been graded or disturbed and for all materials, equipment, and/or operations that need protection. 4. Ownership Notification. If ownership of the construction site changes at any time prior to completion of construction, the new owner of the site shall provide the information required in subsections A and B of this section to the City within 14 calendar days of the change. The party transferring ownership of the construction site shall inform the new owner of this requirement. Notification pursuant to this section by the new owner shall not be required if permanent erosion and sediment control protection measures have been implemented on the construction site pursuant to subsections (C)(9)(b) and (c) of this section. C. Construction Process. During the construction process the person identified as responsible for the SWPPP pursuant to subsection (B)(1) of this section shall be required to: 1. Be present to ensure BMPs are functioning properly. 2. Conduct regular inspections to ascertain if BMPs should be modified to adjust for current site conditions. 3. Maintain an up-to-date printed copy of the SWPPP on the site that identifies BMP changes required for current conditions. 4. Conduct inspection of the construction site prior to an anticipated rainstorm to ensure that the BMPs are adequate. 5. Conduct inspections subsequent to storm events to ensure that the BMPs are performed adequately. During multiple days of rain or rain of high intensity, conduct additional inspections as necessary to establish that all BMPs are performing adequately. 6. Ensure that equipment, material, and workers are available for rapid response to emergencies. 7. Perform necessary maintenance to BMPs within 48 hours of the conclusion of each storm. 8. Keep a record of all inspections performed on the site. This record shall be made available upon request to an authorized enforcement officer. 9. If a construction site becomes idle (a site which is inactive for a period of more than 30 days), compliance with the following shall be required. a. All BMPs identified in the SWPPP shall continue to be maintained and the person responsible for the SWPPP shall remain in charge of the site; or b. The SWPPP shall be revised to provide for permanent erosion protection. If a nonirrigated vegetation by seeding is proposed as primary erosion protection for the site, such seeding will not be considered acceptable until germination and adequate growth have taken place on all critical areas. c. The City shall be notified in writing within 14 calendar days by the permit holder that the construction site is or will become idle. The person responsible for the SWPPP shall inspect the site to ensure the site is adequately protected. Inspection by an authorized enforcement officer shall be requested. Any construction site found idle for 30 days without the installation of adequate protection measures and notification that the site is idle, shall be considered in violation of this section. D. Monitoring Criteria. Monitoring for erosion and sediment control is required as detailed in this section. Site monitoring shall be done by the person responsible for the SWPPP. An authorized enforcement officer may also monitor site compliance at any time and require access to the updated site SWPPP and records of all inspections made. The site monitoring shall be conducted as determined by the Director. The construction site may be considered in compliance with this section if the BMPs are deemed effective. The BMPs shall be deemed effective if: 1. Construction site sediment is not present outside the permit site or is not present on the site in an area which requires protection. 2. No evidence of the discharge of construction materials, trash, or nonstormwater discharges is apparent. 3. No evidence of erosion is present on disturbed areas and slopes. 4. No evidence of construction site sediment buildup in downstream drains and/or drainage ways is apparent. 5. Controls are maintained in accordance with design guidelines. 6. The SWPPP is updated in accordance with the actual construction sequence and BMPs are installed according to actual construction progress. 7. The SWPPP includes BMPs sufficient to ensure that erosion, sediment, and all other pollutants will be realistically controlled. E. The City may require the owner of the construction site that filed for the NOI to engage a registered civil engineer or other qualified professional within 24 hours, to supervise the implementation, inspection, and reporting of the site SWPPP. Such professional shall review the site SWPPP, make any necessary changes and/or additions, and report in writing to the Municipal Utilities Department to confirm that adequate BMPs have been installed; and continue to supervise the site SWPPP until the authorized enforcement officer agrees such supervision is no longer required. F. When all site construction is completed and the site is stabilized, the permit holder shall request an inspection pursuant to Section 15.48.130 prior to filing a notice of termination (NOT) with the SWRCB. Upon filing the NOT the permit holder shall furnish a copy of the NOT to the City.
( Prior code § 13-507 ; Ord. 026-07C.S. § 8 ; Ord. 2021-01-26-1601 § 2 )
Ask a question about Stockton law
Corpus searches the Stockton sections it holds and shows the ones that match, with their citations. Free, no sign-in.
