§ 15.48.110 — Erosion control requirements

Stockton Municipal Code, California (Code 2026-10-13: eCode360 publication current through the 2026-10-13 codification (scraped 2026-11-17)) · Stockton Municipal Code § 15.48.110

Corpus is an independent public-information project, not the official City of Stockton website. Stable reference: corpuslaw.us/code/140bc1b8-a992-4033-849c-eae0ec276339

§ 15.48.110: Erosion control requirements.

Construction Activities Involving Less than One Acre. Construction activities that disturb less than one acre shall provide for effective control of erosion, sediment, and other pollutants. The Director has the authority to require an erosion control and grading permit and an ESCP for any activity upon determining the project poses a threat to water quality. Projects that do not require an erosion control and grading permit due to an exemption based on amount of material and size of area pursuant to Section 15.48.90, shall be subject to erosion control requirements of this section if a building permit is required. The Community Development Department may require the submittal of an ESCP prior to issuing a building permit. The permit holder shall be responsible for the development and implementation of effective erosion and sediment controls and good housekeeping practices, as well as final stabilization control measures. Such controls may be evaluated by the authorized enforcement officer and shall be required to comply with the following provisions. A. Erosion and Sediment Control Plan. If required by the Director, the permit holder shall develop and submit an ESCP within 48 hours of notification by the City. The ESCP shall be implemented year-round and shall be revised to reflect changing conditions on the project site. The combination of BMPs used, and their execution in the field, must be customized to the site using up-to-date standards and practices as identified in the California BMP Handbooks or equivalent pre-approved by the City. The Director may issue ESCP and BMP guidance and minimum requirements. 1. The ESCP shall include: a. A site map depicting erosion control, sediment control, and good housekeeping BMPs; b. A project and BMP implementation schedule; c. A plan to inspect and maintain the BMPs; d. A plan for final stabilization; and e. The name, address, email address, and phone number (including a 24-hour emergency phone number) of the person responsible for implementing, inspecting, and reporting of the site ESCP. B. The City may require the owner of the construction site to engage a registered civil engineer or other qualified professional within 24 hours, to supervise the implementation, inspection, and reporting of the site ESCP. Such professional shall review the site ESCP, make any necessary changes and/or additions, and report in writing to the Municipal Utilities Department to confirm that adequate BMPs have been installed; and continue to supervise the site ESCP until the authorized enforcement officer agrees such supervision is no longer required. C. When all site construction is completed, the permit holder shall request inspection pursuant to Section 15.48.130.

( Prior code § 13-510 ; Ord. 2021-01-26-1601 § 2 )