For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 16.72.200 — Storm drainage facilities

Stockton Municipal Code, California (Code 2026-10-13: eCode360 publication current through the 2026-10-13 codification (scraped 2026-11-17)) · Stockton Municipal Code § 16.72.200

Corpus is an independent public-information project, not the official City of Stockton website. Stable reference: corpuslaw.us/code/a594885a-2110-46ef-be60-4e5648abae03

§ 16.72.200: Storm drainage facilities.

Stormwater runoff from a development shall be collected and conveyed by an approved storm drain system and shall include conveyance to the point of terminal discharge. The storm drain system shall be designed for ultimate development of the drainage area. The storm drain facilities shall provide for the protection of abutting and off-site properties that would be adversely affected by any increase in runoff attributed to the development; off-site storm drain improvements may be required to satisfy this requirement. A. Open Land Development. 1. 50 Percent or More of Delineated Area. Whenever a developer proposes a development that exceeds 50 percent of the developed area within a delineated drainage area: a. The developer shall: i. Design and submit for approval of the City Engineer and Municipal Utilities Director a drainage plan for the entire delineated drainage area. The design shall essentially conform to the City drainage plan for the area in which the development lies; ii. Construct the internal collection system for the development including without limitation all branches, laterals, catch basins and trunk lines; and iii. Concurrently with the first unit of the subdivision construct the outfall works and over-sized trunk lines to a sufficient size and capacity, as determined by the City Engineer, to handle the drainage generated by all potential upstream users within the delineated drainage area. b. The developer may request that an area of benefit be formed to reimburse the developer for the cost of the drainage improvements equal to the difference between the amount it would have cost the developer to install the improvements to serve the development only and the actual cost of the improvements (e.g., the cost of drainage improvements which were oversized to handle drainage from upstream users). 2. Less Than 50 Percent of Delineated Area. Whenever a developer proposes a development that does not exceed 50 percent of the developed area within a delineated drainage area: a. The developer shall: i. Design and submit for approval of the City Engineer a drainage plan for the entire delineated drainage area. The design shall essentially conform to the City drainage plan for the area in which the development lies; ii. Construct the internal collection system for the development including without limitation all branches, laterals, catch basins, and trunk lines; iii. Construct internal oversized trunk lines of sufficient size and capacity as determined by the City Engineer to handle drainage generated by all potential upstream users within the delineated drainage area; and iv. Concurrently with the first unit of the subdivision, design and construct an interim terminal drainage facility, approved by the City Engineer, of sufficient size and capacity to handle internal drainage as well as that of all potential upstream users within the delineated drainage basin. b. The developer may request that an area of benefit be formed to reimburse the developer a proportionate share of the interim terminal drainage facility cost equal to the difference between the amount it would have cost to serve the development only and the actual cost of the improvements (e.g., the cost of interim terminal drainage facility improvements which were oversized to handle drainage from future upstream users). 3. Area of Benefit. The developer may request that an area of benefit be formed for the delineated drainage area. The cost would include the major storm drain lines and the outfall works for the entire delineated drainage area. The developer would pay the area of benefit fee for the entire development minus credits for any portion of the major storm drain lines and outfall works installed. Whenever the credits exceed the area of benefit fee, the City would reimburse the developer from subsequent payments. B. Infill Development. Whenever a developer proposes the construction of improvements on land for which no tentative or final map is required, and where the land is either not served with drainage facilities, or the facilities are inadequate, or where the facilities have already been constructed by an advance of money from the general fund secured by monies to be collected and paid into an "area of benefit" fund, the developer shall: 1. Be assessed and required to pay an area of benefit fee for the entire development for the prorated share of the estimated or actual cost of the major storm drain lines and the outfall works; 2. Make provisions and construct on-site facilities necessary to handle on-site drainage on an interim basis (until the time that a permanent drainage facility is established for the delineated drainage area) in a manner satisfactory to and approved by the City Engineer; 3. Dedicate easements and rights-of-way as may be required by the City Engineer to accommodate the future permanent drainage facility planned for the delineated drainage areas; 4. Enter into an agreement with the City to connect to the permanent drainage facility when it is available. The agreement shall be approved by the City Engineer and shall provide that: a. Construction shall commence within 90 days of the receipt of the notice to proceed from the City; b. In the event of default by the owner, developer, and/or successors-in-interest, the City is authorized to cause the construction to be done and charge the entire cost and expense to the owners, developers, and/or successors-in-interest, including interest from the date of notice of the cost and expense until paid; c. The agreement shall be recorded in the office of the County Recorder at the expense of the owner and shall constitute notice to all successors-in-interest of the title to the real property of the obligation set forth, and also a lien in an amount to fully reimburse the City, including interest as above, subject to foreclosure in event of default in payment. d. In the event of litigation occasioned by any default of the owner, successors or assigns, the owners, developers, and/or successors-in-interest agree to pay all costs involved, including reasonable attorney's fees, and that the same shall become a part of the lien against the real property; and e. The term "owner" shall include not only the present owner but also heirs, successors, executors, administrators and assigns, it being the intent of the parties that the obligations undertaken shall run with the real property and constitutes a lien against it. C. Pump Stations. Pump stations incorporated as part of a permanent drainage discharge system shall be designed in compliance with the standard specifications and plans and municipal utilities pump station design guidelines, and approved by the Director of Municipal Utilities. D. Additional Requirements. Maintenance districts may be formed and continuing assessments levied and payments collected for the purpose of operating and maintaining drainage facilities.

( Prior code § 16-355.210 )

Ask a question about Stockton law

Corpus searches the Stockton sections it holds and shows the ones that match, with their citations. Free, no sign-in.