For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 16.72.230 — Underground utilities

Stockton Municipal Code, California (Code 2026-10-13: eCode360 publication current through the 2026-10-13 codification (scraped 2026-11-17)) · Stockton Municipal Code § 16.72.230

Corpus is an independent public-information project, not the official City of Stockton website. Stable reference: corpuslaw.us/code/ac28a7cc-e14b-444f-9bda-6c2e74a80114

§ 16.72.230: Underground utilities.

Utilities in new subdivisions and single lot developments shall be installed underground, as follows: A. When Undergrounding is Required. 1. All existing and proposed utility distribution facilities (including electric, telecommunications, and cable television lines) installed in and for the purpose of supplying service to any subdivision shall be installed underground. 2. Electric and telephone facilities, fire alarm conduits, street lighting wiring, cable television, and other wiring conduits and similar facilities shall be placed underground by the developer for all new development on an existing lot and when a new electrical hookup is provided in conjunction with the installation/replacement of an electric service panel. Utility vaults shall be subject to review by the Director. The Director may grant a modification or waiver of this requirement, after considering the general purposes and nature of the proposed development, except when the subject property is within an established underground utility district. B. Exceptions. Undergrounding of existing utilities is not required along street frontages less than an aggregate of 300 lineal feet, or for: 1. Facilities exempted by the Public Utilities Commission (PUC); 2. Any municipal equipment or facilities installed under the supervision and to the satisfaction of the City Engineer; 3. Poles or electroliers used exclusively for street lighting; 4. Overhead wires attached to the exterior surface of a structure by means of a bracket or other fixture and extended from one location on the structure to another location on the same structure or to an adjacent structure on the same lot or parcel without crossing any public street; 5. Poles, overhead wires and associated overhead structures used for the transmission of electric energy at nominal voltages in excess of 34,500 volts; 6. Antennas, associated equipment and supporting structures used by a utility for furnishing communication services; 7. Temporary poles, overhead wires and associated overhead structures used or to be used in conjunction with construction projects, or installed and maintained for a period not to exceed 10 days in order to provide emergency service; 8. Overhead utility facilities along existing peripheral street frontages of an affordable housing subdivision or development, that is part of an infrastructure financing district, so long as the adjoining property is already developed and the utility facilities on the peripheral street are overhead; 9. A development or subdivision which has existing overhead utility distribution facilities serving other developed property(s) and which has existing overhead utility distribution facilities that are adjacent to an existing boundary of the development or subdivision whose boundary is not peripheral to and/or within an existing, proposed, or future street(s); 10. Development of an "infill site" as defined in Division 8 (Glossary); and 11. Single lot industrial development with a lot size of 10.0 net acres or less conforming to the definitions of "single lot development" and "infill development" in Division 8 (Glossary). C. Responsibilities of Developer. The developer is responsible for complying with the requirements of this section and shall make the necessary arrangements with the affected utility companies for facility installation. D. Location of Installation. Underground utility lines may be installed within street rights-of-way or along a lot line, subject to appropriate easements being provided if necessary. When installed within street rights-of-way, their location and method of installation, insofar as it affects other improvements within the street right-of-way, shall be subject to the approval of the City Engineer. E. Timing of Installation. Underground utilities that are to be installed under or adjacent to street paving or sidewalks shall be installed before the final improvement of the street. F. Utility Equipment. Utility equipment shall be in compliance with Section 16.80.360 (Utility equipment).

( Prior code § 16-355.240 )

Ask a question about Stockton law

Corpus searches the Stockton sections it holds and shows the ones that match, with their citations. Free, no sign-in.