§ 12.60.210: Stormwater management plan required.

(a) All applications for any city permit or approval required for land disturbance activities, construction, development or significant redevelopment for any regulated project subject to this chapter, including, but not limited to, use permits, specials development permits, grading permits, variances, landscape plans, design review, parcel maps or tentative maps, applicable building permits, or applicable encroachment permits, must include a stormwater management plan. (b) The stormwater management plan shall be accompanied by plans and related documentation demonstrating how the requirements of this chapter will be met, and the permit or approval shall not be granted unless the authorized enforcement official determines that the plan complies with the requirements of this chapter. (c) At the discretion of the authorized enforcement official, the stormwater management plan shall include, but is not limited to, the following: (1) Name and address of regulated project; (2) Responsible operator(s) of each treatment system and hydromodification (HM) control (if any); (3) A description of activities and pollutant sources; (4) Specific descriptions of the locations (or a map showing locations) of the installed stormwater treatment system(s) and HM controls (if any); (5) Description of the type and size of the installed stormwater treatment systems and HM controls, if applicable; (6) Description of applicable operation and maintenance procedures, including recommended inspections, for all structural best management practices/installed stormwater treatment systems, as recommended by the manufacturer or as referenced in the city's Stormwater BMP Guidance Manual; (7) Description of record keeping and internal procedures to ensure documentation and verification of applicable operational maintenance procedures. These records shall remain available for a period of at least three years; (8) A completed stormwater management plan data form; (9) A copy of the required third party certification for the regulated projects adherence to the numeric sizing criteria for stormwater treatment systems; and (10) Property owners shall ensure that on-site, joint, or off-site stormwater treatment system(s) and HM controls installed to meet the requirements for regulated projects are properly operated and maintained for the life of the project pursuant to Section 12.60.280 agreement to maintain best management practices. (A) In cases where the property owner for a stormwater treatment system or HM control has worked diligently and in good faith with the appropriate state and federal agencies to obtain approvals necessary to complete maintenance activities for the treatment system or HM control, but the approvals are not granted, the property owner will be considered to be in compliance with subsection (c)(10). (B) Constructed wetlands installed by regulated projects for urban runoff treatment shall abide by the San Francisco Bay Regional Water Quality Control Board's Resolution No. 94-102: Policy on the Use of Constructed Wetlands for Urban Runoff Pollution Control and the operations and maintenance requirements contained therein.

( Ord. 3213-23 § 1 )