§ 19.54.150 — Radio frequency emission exposure
Code of Ordinances, City of Sunnyvale, California (includes legislation through Ord. No. 3260-26 adopted August 11, 2026) · Sunnyvale Code of Ordinances § 19.54.150
Corpus is an independent public-information project, not the official City of Sunnyvale website. Stable reference: corpuslaw.us/code/ede34585-7368-44c5-b7dc-9451a17e4908
§ 19.54.150: Radio frequency emission exposure.
(a) No wireless telecommunication facility shall be sited or operated in such a manner that it poses, either by itself or in combination with other such facilities, a potential threat to public health. To that end, no facility or combination of facilities shall produce at any time power densities in any inhabited area that exceed the FCC's Maximum Permissible Exposure (MPE) limits for electric and magnetic field strength and power density for transmitters or any more restrictive standard subsequently adopted or promulgated by the city, county, the state of California, or the federal government. (b) Initial compliance with this requirement shall be demonstrated for any facility within three hundred feet of residential uses or sensitive receptors such as schools, churches, hospitals, etc., and all broadcast radio and television facilities, regardless of adjacent land uses, through submission, at the time of application for the necessary permit or entitlement, calculations specifying MPE levels in the inhabited area where the levels produced are projected to be highest. If these calculated levels exceed eighty percent of the MPE limits, the applicant shall hire a qualified electrical engineer licensed by the state of California to measure exposure levels at the location after the facility is in operation. A report of these measurements and the engineer's findings with respect to compliance with MPE limits shall be submitted to the director of community development. The facility shall not commence normal operations until it complies with, or has been modified to comply with this standard. Proof of compliance shall be a certification provided by the engineer who prepared the original report. In order to assure the objectivity of the analysis, the city may require, at the applicant's expense, independent verification of the results of the analysis. (c) Every wireless telecommunication facility within three hundred feet of an inhabited area and all broadcast radio and television facilities shall demonstrate continued compliance with the MPE limits. Every five years a report listing each transmitter and antenna present at the facility and the effective radiated power radiated shall be submitted to the director of community development. If either the equipment or effective radiated power has changed, calculations specifying exposure levels in the inhabited areas where the levels are projected to be highest shall be prepared. Calculations shall also be prepared every time the adopted MPE limits change. If calculated levels in either of these cases exceed eighty percent of the MPE limits, the operator of the facility shall hire a qualified electrical engineer licensed by the state of California to measure the actual exposure levels produced. A report of these calculations, required measurements, if any, and the engineer's findings with respect to compliance with the current MPE limits shall be submitted to the director of community development within five years of facility approval and every five years thereafter. In the case of a change in the limits, the required report shall be submitted within ninety days of the date the change becomes effective. (d) Failure to supply the required reports or to remain in continued compliance with the MPE limits shall be grounds for revocation of the discretionary permit.
( Prior zoning code § 19.70.160 ; Ord. 2623-99 § 1 )
Ask a question about Sunnyvale law
Corpus searches the Sunnyvale sections it holds and shows the ones that match, with their citations. Free, no sign-in.
