For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 15.04.100 — Expedited review of small residential rooftop solar energy system permits

Municipal Code, City of Temecula, California (legislation through Ord. No. 2026-04 adopted April 14, 2026) · Temecula Municipal Code § 15.04.100

Corpus is an independent public-information project, not the official City of Temecula website. Stable reference: corpuslaw.us/code/c35114b1-b6a4-46c1-bc68-c570318646bf

§ 15.04.100: Expedited review of small residential rooftop solar energy system permits.

A. Definitions. 1. "Small residential rooftop solar energy system" shall have the same meaning as provided in the Solar Rights Act, Government Code Section 65850.5(j)(3), as the same may be amended from time to time. B. Small Residential Rooftop Solar Energy System Standard Plan and Permit Application Checklist. 1. The building official is authorized to develop and update the standard plan(s) and check-list(s) of all requirements with which small residential rooftop solar energy systems shall comply to be eligible for expedited review. The small residential rooftop solar system standard plan(s) and check-list(s) shall substantially conform to recommendations for expedited permitting, including the check-lists and standard plans contained in the most cur-rent version of the California Solar Permitting Guidebook adopted by the Governor's Office of Planning and Research, and must be consistent with state law. 2. All documents required for the submission of a small residential rooftop solar energy sys-tem permit application, the standard plan(s), and checklist(s) shall be made available on the publicly accessible city website. 3. Electronic submittal of the required permit application and documents by the Internet shall be available to all small residential rooftop solar energy system permit applicants. (An applicant's electronic signature shall be accepted on all forms, applications, and other documents in lieu of a wet signature.) C. Permit Application Review. 1. An application that satisfies the information requirements in the checklist(s) and standard plan(s) shall be deemed complete. 2. If an application is deemed incomplete, a written correction notice detailing all deficiencies in the application and any additional information or documentation required to be eligible for expedited permit issuance shall be sent to the applicant for resubmission. 3. The building official shall issue a build-ing permit for any complete application that meets the requirements of the approved checklist(s) and standard plan(s) as follows: within one to three business days for over the counter and electronic applications, or as soon thereafter as may be practicable. Review of the application shall be limited to the building official's review of whether the application meets local, state, and federal health and safety requirements. 4. Any condition imposed on an application shall be designed to mitigate the specific, ad-verse impact upon health and safety at the lowest possible cost. D. Inspection Requirements. 1. Inspection requests may be submitted by email or phone. 2. Only one inspection shall be required and performed by the building official for small residential rooftop solar energy systems eligible for expedited review. 3. The inspection shall be done in a timely manner. The building official shall use his or her best efforts to schedule an inspection within two business days of a request and provide a four-hour inspection window. 4. If a small residential rooftop solar en-ergy system fails inspection, a subsequent inspection is authorized but need not conform to the requirements of this section. E. Fees. Fees for permits and inspections associated with this section may be established by resolution of the city council.

( Ord. 15-08 § 3 )

Ask a question about Temecula law

Corpus searches the Temecula sections it holds and shows the ones that match, with their citations. Free, no sign-in.