§ 17.32.040 — Procedures

Municipal Code, City of Temecula, California (legislation through Ord. No. 2026-04 adopted April 14, 2026) · Temecula Municipal Code § 17.32.040

Corpus is an independent public-information project, not the official City of Temecula website. Stable reference: corpuslaw.us/code/0e19b0b6-b5b4-44df-889d-5ff1d576c853

§ 17.32.040: Procedures.

A. The submittal, review, revision and approval of all required landscape and irrigation plans shall be in compliance with already established city procedures for land use entitlements. The requirements of this chapter shall be submitted jointly along with the required applications, plans and fees required for land use entitlement as required by the director of community development and on file in the community development department. B. The landscape plan package shall include: construction landscape plans, irrigation plans, agronomic soils report, water budget, irrigation schedule, and maintenance schedule. C. An agronomic soil report is required on all projects for appropriate specifications of soil amendments, and to facilitate selection of water efficient plant species suitable for the site. A soil analysis shall be conducted for the site from reasonable soil samples of the site. The soil report shall describe the soil type, pH, soluble salts, infiltration rate, limiting soil characteristics, and recommended soil amendments needed to remediate limiting soil characteristics. D. A construction cost estimate is required with all construction landscape plans. E. A landscape maintenance schedule is required with all landscape plans as identified in Section 17.32.110. F. Landscaping plans shall be prepared using the water budget formula described in Appendix A in Section 17.32.200. In addition, landscaping plans shall provide a water budget which includes estimated annual water use (in hundred cubic feet per year (ccf/yr)) and the area (in square feet) to be irrigated; and precipitation rates for each valve circuit. The director of community development or designee shall approve all landscaping plans. G. Prior to the issuance of a building permit for a project, subject to this chapter, or as otherwise specified in the conditions of approval for a project, planting and irrigation plans prepared for the project shall be submitted for review and approval by the director of community development. H. Prior to the issuance of a certificate of use and occupancy, an applicant shall submit a letter of completion, subject to field verification by the planning director or designee. Said letter of completion shall be prepared by the landscape architect and shall indicate that all plant materials and irrigation system components have been installed in accordance with the approved final landscape and irrigation plans. If a certificate of use and occupancy is not required for the project, such letter of completion shall be submitted prior to scheduling for the final inspection. The letter of completion shall be signed and certified by a licensed landscape architect and shall indicate: 1. Date. 2. Project information: a. Project name. b. Project applicant name, mailing address, telephone number. c. Project address. d. Property owner name and mailing address. 3. A field inspection of the irrigation system was completed prior to backfilling (evidence of field inspection shall be attached). 4. The landscaping has been installed in conformance with the approved planting and irrigation plans. a. Where there have been significant changes made in the field during construction, "as-built" drawings shall be included with the certification. b. A diagram of the irrigation plan showing hydrozones shall be kept with the irrigation controller for subsequent management purposes. 5. Irrigation audit report performed by a certified irrigation auditor after project installation (audit report shall be attached). 6. The irrigation controller has been set according to the irrigation schedule. 7. The irrigation system has been adjusted to maximize irrigation efficiency and eliminate overspray and runoff. 8. A copy of the irrigation and maintenance schedule has been given to the property owner, local water purveyor, and the director of community development. I. All landscape irrigation audits shall comply with the most current publication of the "Irrigation Association Certified Landscape Irrigation Auditor Training Manual" and shall be conducted by a certified landscape irrigation auditor. J. The director of community development or designee shall have the right to enter upon the project site at any time before, during and after installation of the landscaping to conduct inspections for the purposes of enforcing this chapter.

( Ord. 08-07 § 4 ; Ord. 09-08 § 4 ; Ord. 15-11 § 2 )