§ 17.32.090 — Irrigation system design requirements
Municipal Code, City of Temecula, California (legislation through Ord. No. 2026-04 adopted April 14, 2026) · Temecula Municipal Code § 17.32.090
Corpus is an independent public-information project, not the official City of Temecula website. Stable reference: corpuslaw.us/code/79ae729f-a477-4dbe-b751-92072091daad
§ 17.32.090: Irrigation system design requirements.
All irrigation systems shall be designed, constructed, managed, and maintained to achieve the highest overall efficiency possible. Efficiency is measured by the amount of water beneficially used to sustain plant life divided by the amount of water applied. Efficiency is affected by the attributes of the controller, method of irrigation, irrigation equipment, proper hydrozoning, site topography, condition and size of plants, and weather conditions. The design and installation of all irrigation improvements shall be in compliance with the following provisions: A. Landscape water meters, defined as either a dedicated water service meter or primate submeter shall be installed for all nonresidential irrigated landscapes of one thousand square feet or greater and residential irrigated landscapes of five thousand square feet or greater. A landscape water meter may be either: 1. A customer service meter dedicated to landscape use provided by the local water purveyor. 2. A privately owned meter or submeter. B. The irrigation plan shall incorporate appropriate irrigation equipment, drip irrigation, bubbler, spray head, and/or rotor irrigation heads in order to provide the most efficient irrigation system. C. A manual shut-off valve shall be required as close as possible to the point of connection of the water supply, to minimize water loss in case of an emergency or routine repair. D. The irrigation plan shall be prepared at the same scale as the construction landscape plan and, at a minimum, shall identify the following: 1. Location and size of service lateral(s). 2. Location and size of water meter(s). 3. Point of connection (POC) location and static pressure at POC. Each point of connection shall indicate the size of the water meter, the static pressure available, and the maximum flow of the irrigation system. 4. Manufacturer's name, model number, total flow rate (gallons per minute), designed operating pressure (psi), and precipitation rate for each overhead spray and bubbler circuit, and total flow rate (gallons per hour) and design operating pressure (psi) for each drip and low volume irrigation circuit. 5. Location, size, and type of all irrigation components including, but not limited to: smart controller, central controller, master valve, flow sensor, backflow prevention device, ball valves, anti-drain check valves, pressure supply (main) line, lateral lines, pipe sizing, valves, spray heads, rotors, drip, low volume irrigation equipment, gallons per minute, pressure regulators, and pumps. 6. Hydraulic calculation worksheet including flow rate (gallons per minute), design operating pressure, and pressure loss for valve with "worse condition." 7. Precipitation rate (inches per hour) for each spray type circuit. 8. Irrigation legend to include all irrigation equipment used on the project. 9. Location and identification of each hydrozone. 10. A hydrozone information table for each hydrozone. 11. Topographic elevation lines to determine slope. 12. Proximity to existing or planned recycled/non-potable water lines. 13. Irrigation system details for assembly and installation. 14. Calculation for the project's landscape water budget formula (see Appendix A in Section 17.32.200). E. Automatic irrigation controllers utilizing either evapotranspiration or soil moisture sensor data shall be required for irrigation scheduling in all irrigation systems. F. If the water pressure is below or exceeds the recommended pressure of the specified irrigation devices, the installation of a pressure regulating device is required to ensure the dynamic pressure at each emission device is within the manufacturer's recommended pressure range for optimal performance. G. If the static pressure is above or below the required dynamic pressure of the irrigation system, pressure-regulating devices such as inline pressure regulators, booster pumps, or other devices shall be installed to meet the required dynamic pressure of the irrigation system. H. Static water pressure, dynamic or operating pressure and flow reading of the water supply shall be measured at the point of connection. These pressure and flow measurements shall be conducted at the design stage. If the measurements are not available at the design stage, the measurements shall be conducted at installation. I. Sensors (rain, freeze, wind, etc.), either integral or auxiliary, that suspend or alter irrigation operation during unfavorable weather conditions shall be required on all irrigation systems, as appropriate for local climatic conditions. Rain sensors shall be placed within an unobstructed natural rainfall area and shall be located above the irrigation spray pattern. J. Backflow prevention devices shall be required to protect the water supply from contamination by the irrigation system. K. Flow sensors that detect high flow conditions created by system damage or malfunction are required for all nonresidential landscapes and residential landscapes of five thousand square feet or larger. L. Master shut-off valves are required on all projects except landscapes that make use of technologies that allow for the individual control of sprinklers that are individually pressurized in a system equipped with low pressure shut down features. M. All irrigation emission devices must meet the requirements set in the American National Standards Institute (ANSI) standard, American Society of Agricultural and Biological Engineer's/International Code Council's (ASABE/ICC) 802-2014 "Landscape Irrigation Sprinkler and Emitter Standards." All sprinkler heads installed in the landscape must document a distribution uniformity low quarter of 0.65 or higher using the protocol defined in ASABE/ICC 802-2014. N. Residential front yard typical irrigation plans must demonstrate that sufficient capacity exists on the specified irrigation controller to supply adequate additional zones for future side and backyard landscaping. More than one controller per residential unit shall be avoided. O. All nonresidential irrigation plans shall be designed for use of non-potable water in all areas scheduled for non-potable water in the future. Provisions for the conversion to a nonpotable water system shall be provided within the landscape plan should there be the possibility for future nonpotable water availability. Water systems designed to utilize nonpotable water shall be designed to meet all applicable standards of the city of Temecula, the California Regional Water Quality Control Board, State Department of Health Services, the Riverside County health department and the local reclaimed water purveyor. P. Separate valves shall be provided for separate water use planting areas, so that plants with similar water needs are irrigated by the same irrigation valve. Drip irrigation techniques or similar high-efficiency irrigation type shall be provided where appropriate (i.e., shrubs, massing in-mulched areas) in instances where spray irrigation is not necessary. Q. A separate valve shall be dedicated to trees with a minimum of two irrigation bubblers per tree. R. Irrigation systems shall be zoned according to plant water use, slope aspect, and sun/shade microclimate. If low water use plants (that can also survive/flourish with medium water application) are used within a medium water use hydrozone, they must be counted as medium water use in the irrigation calculations. High water use plants may not be mixed with low water use plants within the same hydrozone. S. The capacity of the irrigation systems shall not exceed: 1. The capacity required for peak water demand based on water budget calculations. 2. Meter capacity. 3. Backflow preventer type and device capacity. T. The use of head check valves shall be included in irrigation systems where low point drainage could occur. U. The use of swing/spring check valves shall be proved in lateral lines where elevation differences from the valve to highest head exceeds seven feet. V. Low head drainage is not permitted. W. Swing joints or other riser-protection components are required on all risers subject to damage that are adjacent to hardscape or in high traffic areas of turf grass. X. Bermed areas should be irrigated with drip line irrigation. If overhead irrigation is necessary for bermed areas, then sprinkler heads shall be placed at the toe of the berm. Y. Slopes greater than twenty-five percent shall not be irrigated with an irrigation system with an application rate exceeding 0.75 inches per hour. Z. Overhead spray systems shall not be used in landscape areas narrower than ten feet in width with the exception of an engineered bioretention area approved by the director of public works. AA. Overhead irrigation shall not be permitted within twenty-four inches of any non-permeable surface, unless the landscaped area is adjacent to a permeable surface and no overspray or run-off occurs. BB. In mulched planting areas, the use of low volume irrigation is required to maximize water infiltration into the root zone. CC. Rotors and spray heads shall be designed and installed with no overspray onto non-permeable surfaces, structures, and non-vegetated areas. Head-to-head coverage with matched precipitation heads shall be required, unless otherwise directed by the manufacturer. Rotors and spray heads shall be zoned separately. Half rotors and full rotors shall be zoned separately unless matched precipitation nozzles are used. DD. Point-to-point drip systems shall utilize Schedule 40 PVC lateral lines. The lateral lines shall either be placed on-grade and secured with pipe anchors at a minimum ten feet on center for slopes greater than 3:1 or buried one foot below grade. EE. High efficiency irrigation methods (e.g., drip, MP rotators, and microsprays) are required for appropriate applications. FF. For drip line installations, in-line pressure regulators shall be used per factory recommendations for the specific irrigation products being used. If drip line is being installed, it must be filtered at the valve along with any other necessary equipment. GG. Drip system operator indicators shall be included for each drip irrigation valve. HH. The delivery tubing for point-to-point irrigation systems shall be no longer than three feet and attached to grade at minimum two-foot intervals. II. Emitter line drip systems shall have the lines placed no more than eighteen inches apart. The emitter lines adjacent to curbs or walks shall be placed at a maximum of nine inches from the curb or walk. Emitter lines shall be attached to grade at a minimum of five feet on-center. All plants shall be planted between two emitter lines. JJ. The finish grade for all on-grade drip systems shall be a minimum of three inches below adjacent curbs or walks. KK. All drip systems shall utilize the mature canopy size of the plant in determining the number of emitters to be placed at each plant. A schedule showing the varying amount of emitters shall be placed on the plans. The run-times shall be shown in the irrigation schedules. LL. The maximum square feet of any drip valve shall be two thousand five hundred square feet. MM. All nonresidential drip systems shall have a brass/bronze line-sized basket strainer placed at the point of connection. NN. Systems shall be scheduled so that the irrigation precipitation rate does not exceed the infiltration rate of the soil. OO. A baseline irrigation schedule shall be provided on the plans for the six-month initial plant establishment period. The contractor shall adjust the schedule to meet site specific requirements and use the baseline schedule to set the weather based controller. The schedule currently in effect shall be posted in the controller. PP. A second baseline irrigation schedule shall be provided on the plans which incorporate the specific water needs of the plants throughout the post-establishment calendar year. The contractor shall adjust the schedule to meet site specific requirements and use the baseline schedule to set the weather based controller. The schedule currently in effect shall be posted in the controller. QQ. The irrigation schedules shall include the recommended irrigation days per week, number of cycles per day, minutes of run times per cycle, and estimated amount of applied irrigation water, expressed in gallons per month and gallons per year. RR. The controller shall be operational and set to real-time weather prior to the completion of the ninety-day maintenance period of the installing contractor. SS. After establishment of the plant materials, the irrigation of landscaped areas shall be limited to the hours between dusk and early morning in order to provide maximum benefit to the plant material and to reduce unnecessary water loss through wind drift and evaporation. Drip irrigation systems are exempt from this provision.
( Ord. 08-07 § 4 ; Ord. 09-08 § 4 ; Ord. 15-11 § 2 ; Ord. 2025-15 , 11/18/2025 )
Ask a question about Temecula law
Corpus searches the Temecula sections it holds and shows the ones that match, with their citations. Free, no sign-in.