§ 18.09.020 — Haul route permits required
Municipal Code, City of Temecula, California (legislation through Ord. No. 2026-04 adopted April 14, 2026) · Temecula Municipal Code § 18.09.020
Corpus is an independent public-information project, not the official City of Temecula website. Stable reference: corpuslaw.us/code/50ca9186-eec7-490c-84cb-d3f1d099911d
§ 18.09.020: Haul route permits required.
No person shall conduct any hauling of soil materials on public rights-of-way from or to the site of a grading operation, without first having obtained a haul route permit, if required, as specified in and subject to the requirements of the Engineering and Construction Manual. Because this permit may be triggered by various factors (location, quantity of soil, truck trips, traffic, etc.), the city will determine if a haul route permit is required on a case-by-case basis prior to allowing any hauling operation to commence.
( Ord. 13-01 § 4 )
Ask a question about Temecula law
Corpus searches the Temecula sections it holds and shows the ones that match, with their citations. Free, no sign-in.
