§ 18.09.060: Haul route requirements.
Where soil materials are moved on public rights-of-way from or to the site of a grading operation, a haul route plan shall be approved by the city engineer in accordance with the Engineering and Construction Manual. Deviation from the designated haul route shall constitute a violation of the conditions of the permit issued under this title. Vehicular track-out shall be controlled, as directed by the city engineer, to prevent sediment deposition outside of the project site boundaries. All haul route requirements shall be in accordance with this title and the Engineering and Construction Manual.
( Ord. 13-01 § 4 )
Ask a question about Temecula law
Corpus searches the Temecula sections it holds and shows the ones that match, with their citations. Free, no sign-in.