§ 18.18.040: Erosion and sediment control systems.
A. All erosion and sediment control measures shall be designed and implemented to manage stormwater and nonstormwater discharges from the site at all times in accordance with the Engineering and Construction Manual, this title, and all state and federal requirements. B. References used in identifying functional and practical erosion and sediment control measures and standards for the planning and design in the city of Temecula may include the California Stormwater Quality Association's BMP Handbook for Construction and other equivalent sources. C. The permittee shall: 1. Be responsible for the control of erosion and sediment discharges on and from all disturbed areas of grading until issuance of certificate of occupancy, at which time the BMPs of the water quality management plan (WQMP) shall be in place and operational. 2. Implement the required BMPs year round. Additional site specific BMPs shall also be implemented, as necessary, to comply with this title, which may be more stringent than those required under the construction general permit. 3. Implement additional controls (source and treatment) for construction sites that are adjacent or tributary to Clean Water Act Section 303(d) water bodies. Each permittee shall also implement additional controls for construction sites within, adjacent or discharging directly to environmentally sensitive areas. 4. Conduct construction site inspection for compliance with this title and all applicable permits. D. No grading work shall be allowed on any portion of the site when the city engineer determines that erosion, mudflow or sediment discharges may adversely affect downstream properties, drainage courses, storm drains, streets, easements, or public or private facilities or improvements unless an approved erosion and sediment control system has been implemented on the site. If the city determines that it is necessary for the city to cause erosion and sediment control measures to be installed or cleanup to be done, the permittee shall pay all of the city's direct and indirect costs including extra inspection, supervision and reasonable overhead charges in accordance with Section 18.24.120 "Cost recovery fees" of this title. E. All protective devices shown on the erosion and sediment control plan and in the SWPPP, if applicable, shall be in place within seven days prior to any forecast rain. If the permittee does not install or maintain erosion and sediment controls or if any cleanup is required, the city engineer may order city crews to do the work or may issue contracts for such work and charge the cost of this work along with indirect costs, extra inspections, supervision and reasonable overhead charges to the cash deposits or other instruments implemented for this work without further notification to the owner. No additional work on the project except erosion and sediment control work shall be performed until the full amount drawn from the cash deposit, in accordance with Section 18.24.140 "Securities" of this title is restored by the permittee. F. Cut and fill slopes shall be protected to control against erosion and sediment discharges until sufficient permanent landscaping has been established. One hundred percent must be in place prior to issuance of certificate of occupancy.
( Ord. 13-01 § 4 )
Ask a question about Temecula law
Corpus searches the Temecula sections it holds and shows the ones that match, with their citations. Free, no sign-in.