§ 18.18.100 — Best management practices (BMP)
Municipal Code, City of Temecula, California (legislation through Ord. No. 2026-04 adopted April 14, 2026) · Temecula Municipal Code § 18.18.100
Corpus is an independent public-information project, not the official City of Temecula website. Stable reference: corpuslaw.us/code/9f37c58c-1c5f-4dc8-915f-f66e3fb97fae
§ 18.18.100: Best management practices (BMP).
A. Best management practices are management practices and operating procedures/devices executed to prevent or reduce pollutant discharges into public or private stormwater conveyance systems. BMPs are effective methods to reduce the movement of pollutants such as sediment, nutrients, pesticides, etc., from a construction site to surface or groundwater. The intent of BMPs is to significantly reduce pollutant discharges and protect our bodies of water by maintaining effective water quality practices. As there may be many potential BMPs to utilize, careful consideration must be given to selecting the appropriate BMPs to use that are both practical and effective water quality protective measures. B. BMPs shall be implemented on a continual basis during construction activities. The following minimum criteria shall be met: 1. An effective combination of erosion and sediment controls shall be implemented within seven working days of clearing or inactivity in construction. 2. Soil stockpiles must be stabilized with a combination of erosion and sediment controls and have a daily maintenance frequency or as directed by the city engineer. 3. Waterway and watercourse protection shall include, but not be limited to, stabilization of the channel before, during and after state-approved in-channel work. 4. Additional erosion and sediment control materials shall be stockpiled at various locations throughout the site for immediate implementation within seven days of a forecast rain. The developer/contractor shall make equipment and workers for emergency work available to protect the site. C. Erosion control BMPs shall include temporary or permanent erosion control devices (or both) that comply with city and engineering standards as well as state and federal requirements. D. Temporary site vegetation shall be required, as determined by the city engineer, on any disturbed soil areas of the site when construction activities cease indefinitely and/or when expiration of a grading permit occurs. Temporary site vegetation shall be performed in accordance with Sections 18.06.160 and 18.12.120. Temporary vegetation shall not negate any city requirement or condition of approval to install permanent landscaping. E. Sediment control BMPs shall include temporary or permanent sediment control devices (or both) that comply with city and engineering standards as well as state and federal requirements.
( Ord. 13-01 § 4 )
Ask a question about Temecula law
Corpus searches the Temecula sections it holds and shows the ones that match, with their citations. Free, no sign-in.
