For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 815.4.100 — Information required on plans

Municipal Code, City of Torrance, California · Torrance Municipal Code § 815.4.100

Corpus is an independent public-information project, not the official City of Torrance website. Stable reference: corpuslaw.us/code/d334e480-2adc-45f3-8a4b-37613cf1d2e0

§ 815.4.100: Information required on plans.

a) General. In addition to administrative items, the plans and specifications required by the Building Official shall be of sufficient clarity to indicate the nature, design methodology, and extent of the proposed work and to show in detail that it will conform to the provisions of this division and the Building Code. b) Phase 1 Licensed Design Professional Statement. Where engineers plans are required, the Licensed Design Professional shall provide the following statements on the approved plans: I am responsible for designing this building’s Phase 1 seismic strengthening in compliance with the minimum standards of the Mandatory Seismic Strengthening Provisions for Pre-Northridge Steel Moment Frame Buildings (Division 8, Chapter 15, Article 4 of the Torrance Municipal Code). c) Phase 2 Licensed Design Professional Statement. The responsible Licensed Design Professional shall provide the following statements on the approved plans: I am responsible for designing this building’s Phase 2 seismic strengthening in compliance with the minimum standards of the Mandatory Seismic Strengthening Provisions for Pre-Northridge Steel Moment Frame Buildings (Division 8, Chapter 15, Article 4 of the Torrance Municipal Code). d) Phase 1 Owner or Owner’s Representative Statement. Unless the entire building has been retrofitted to meet the full intent of the current building code. The Owner shall provide and sign the following statement on the cover of the drawings: I __________ understand the seismic evaluation and strengthening performed under this project is limited to a Deficiency only Mitigation under the Phase 1 requirements of the Mandatory Seismic Strengthening Provisions for Pre-Northridge Steel Moment Frame Buildings (Division 8, Chapter 15, Article 4 of the Torrance Municipal Code) which is intended to limit the risk under a seismic event. I understand the full building has not been strengthened for other potential structural deficiencies that may cause a life safety concern, injury, or property damage risk under a seismic event. e) Phase 2 Owner or Owner’s Representative Statement. The Owner shall provide and sign the following statement on the cover of the drawings: I __________ understand the seismic evaluation and strengthening performed under this project is in conformance with the Mandatory Seismic Strengthening Provisions for Pre-Northridge Steel Moment Frame Buildings (Division 8, Chapter 15, Article 4 of the Torrance Municipal Code) which is intended to limit the risk under a seismic event. f) Quality Control and Assurance Requirements. General notes shall show the requirements for material testing, special inspection, structural observation, and the proper installation of newly added materials.

Ask a question about Torrance law

Corpus searches the Torrance sections it holds and shows the ones that match, with their citations. Free, no sign-in.