§ 12.08.010 — Grading, excavating, etc
Code of Ordinances, City of Upland, California (eCode360 UP5026 version 2025-09-22: Includes legislation through Ord. No. 2002 adopted September 22, 2025) · Upland Municipal Code § 12.08.010
Corpus is an independent public-information project, not the official City of Upland website. Stable reference: corpuslaw.us/code/909baefc-7113-4da4-a563-44a98c27fa73
§ 12.08.010: Grading, excavating, etc.
A. It is deemed unlawful for any person to make, suffer or to cause to be made any excavation in any public right-of-way or make any improvements on, under, over or across any street, alley or public place within, and under the jurisdiction and control of the city of Upland, without first obtaining from the city a permit authorizing such work. No permit to excavate will be issued if the applicant does not have or has not demonstrated legal right or authority to occupy and use the public right-of-way for the purposes identified in the application. B. Unless the street is identified in the city's then adopted capital improvement program (CIP), excavations in any street, regardless of the street's age or condition, shall be subject to the following provisions: 1. The party responsible for making, suffering or causing the excavation to be made shall restore or cause to be restored such excavation in the manner specified herein: a. For lateral cuts in the street: i. Final resurfacing shall include the grinding of existing, surrounding pavement and repaving at a minimum depth of 0.15 feet. The applicant shall grind five feet on either side of the trench line for residential streets for the trench length, and 10 feet on either side of the trench for nonresidential streets for the trench length. ii. Slurry seal shall be applied 30 feet on either side of the trench line for a length equivalent to the full width of residential streets, and for a length equivalent to the half width of nonresidential streets. iii. If the distance between any two trenches, including the finished resurfacing area(s) as required herein and approved under permit, is less than 10 feet, the final resurfacing shall be extended to encompass the area between the trenches. b. For longitudinal cuts in the street: i. Final resurfacing shall include the grinding of existing, surrounding pavement and repaving at a minimum depth of 0.15 feet. The applicant shall grind two feet on either side of the trench line for residential streets, and the width of the affected travel lane(s) for nonresidential streets. If the remainder pavement between the edge of cut and gutter lip is 48 inches or less, said pavement shall be included in the final resurfacing. ii. Slurry seal shall be applied for the full width of residential streets and half width of nonresidential streets. iii. In all cases, the resurfacing shall be for the full length of the trench, but not less than 100 feet. c. For trenches other than those that are longitudinal or lateral, the city engineer shall establish the appropriate limits of paving in his or her sole reasonable discretion.
( Ord. 1841 § 1, 2009 )
Ask a question about Upland law
Corpus searches the Upland sections it holds and shows the ones that match, with their citations. Free, no sign-in.
