§ 12.08.015: Excavations in new pavement.

A. No permit shall be issued which would permit an excavation, or pavement cut, in newly paved streets unless the applicant can demonstrate clearly to the city engineer that the public health and safety require the contemplated work be permitted, and that there are no reasonable alternatives to cutting and/or excavating. This prohibition shall not apply to public agencies or public utilities when repairs are required to repair or replace failed pipelines and conduits, or when a new connection, which could not have been anticipated, must be made to satisfy a current need of that agency or utility. B. Newly paved streets are defined as those constructed, recently reconstructed, or repaved, with the improvements having been completed and accepted by the city not less than 60 months prior to the date of the request for cutting or excavation. C. If an installation or repair is demonstrated to be critically needed and no other alternatives exist, the city engineer may approve an open cut or excavation within newly paved streets, subject to the following provisions: 1. The party responsible for making, suffering or causing the cut or excavation shall restore or cause to be restored such cut or excavation in the manner specified herein: a. For lateral cuts in the street: i. Final resurfacing shall include the grinding of existing, surrounding pavement and repaving at a minimum depth of 0.15 feet. The applicant shall grind 10 feet on either side of the trench line for the full width of residential streets, and 20 feet on either side of the trench for the full width of nonresidential streets. ii. Slurry seal shall be applied 50 feet on either side of the trench line, and for a length equivalent to the width of the street. iii. If the distance between any two trenches, including the finished resurfacing area(s) as required herein and approved under permit, is less than 10 feet, the final resurfacing shall be extended to encompass the area between the trenches. b. For longitudinal cuts in the street: i. Final resurfacing shall include the grinding of existing, surrounding pavement and repaving at a minimum depth of 0.15 feet. The applicant shall grind the entire width of residential streets, and the half-street width between the curb and centerline (or raised median) for nonresidential streets. ii. If there is no raised median, slurry seal shall be applied for the full width of nonresidential streets. iii. In all cases, the resurfacing shall be for the full length of the trench, but not less than 1,000 feet. c. For trenches other than those that are longitudinal or lateral, the city engineer shall establish the appropriate limits of paving in his or her sole reasonable discretion.

( Ord. 1841 § 2, 2009 )