For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 4-1-2-6 — Regulatory Floodplain—General standards

Code of Ordinances of the City of Arvada, Colorado (Supp. No. 67: codified through Ordinance No. 4932, enacted May 5, 2026) · Arvada Land Development Code, art. 4-1, § 4-1-2-6

Corpus is an independent public-information project, not the official City of Arvada website. Stable reference: corpuslaw.us/code/f598142f-9779-480c-a8e6-a0306b242efe

4-1-2-6. - Regulatory Floodplain—General standards.

A. Generally. The general standards of this Section apply to all areas within the Regulatory Floodplain and all floodplain areas as defined in Section 4-1-2-5(6). B. Anchoring. 1. All new construction and substantial improvements shall be anchored to prevent flotation, collapse, or lateral movement of the structure, and capable of resisting the hydrostatic and hydrodynamic loads. 2. All manufactured homes must be elevated and anchored to resist flotation, collapse, or lateral movement and must be capable of resisting the hydrostatic and hydrodynamic loads. Methods of anchoring may include, but are not limited to, use of over-the-top or frame ties to ground anchors. This requirement is in addition to applicable state and local anchoring requirements for resisting wind forces. Specific requirements may be: a. Over-the-top ties provided at each of the four corners of the manufactured home, with two additional ties per side at intermediate locations, with manufactured homes less than 50 feet long requiring only one additional tie per side; and b. Frame ties provided at each corner of the home with five additional ties per side at intermediate points, with manufactured homes less than 50 feet long requiring four additional ties per side; and c. All components of the anchoring system must be capable of carrying a force of 4,800 pounds; and d. Any additions to the manufactured home be similarly anchored. C. Construction Materials and Methods. 1. All new construction and substantial improvements shall be constructed with utility equipment resistant to flood damage and using materials and methods that minimize flood damage. 2. All new construction and substantial improvements shall be constructed with electrical, heating, ventilation, plumbing, and air conditioning equipment and other service facilities that are designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding. 3. New construction and substantial improvements, with fully enclosed areas below the lowest floor that are usable solely for parking of vehicles, building access, or storage in an area other than a basement and which are subject to flooding, shall be designed to automatically equalize hydrostatic flood forces on exterior walls by allowing for the entry and exit of floodwaters. Designs for meeting this requirement must either be certified by a registered Colorado Professional Engineer or architect, or meet or exceed the following minimum criteria: a. A minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding shall be provided. b. The bottom of all openings shall be no higher than one foot above lowest adjacent grade (LAG). c. Openings may be equipped with screens, louvers, valves, or other coverings or devices provided that they permit the automatic entry and exit of floodwaters. D. Utilities. 1. All new and replacement water supply systems shall be designed to minimize or eliminate infiltration of flood waters into the system. 2. New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of flood waters into the systems and discharge from the systems into flood waters. 3. On-site waste disposal systems shall be located to avoid impairment to them or contamination from them during flooding. E. Fences. 1. Fences may be permitted in the Regulatory Floodplain depending on the type and use of the fence at the discretion of the Floodplain Administrator. Any proposed fence in the Regulatory Floodplain shall require review by the Floodplain Administrator and issuance of a Floodplain Development Permit, in addition to other required permit(s). Table 4-1-2-6 is a guideline to provide assistance with understanding and selecting appropriate fencing in a floodplain, however exceptions may be made on a case-by-case basis upon the Floodplain Administrator's evaluation of the following: the proposed location of the fence and the designation of the location (i.e. whether the location is within the Flood Fringe Sub-Zone, Floodway Sub-Zone, Shallow Flooding Zone, etc.), the materials used for the fence (i.e. wire, rails, chain link, pickets, masonry, etc.), the dimension and length of the fence, and whether the fence is being replaced in kind. Table 4-1-2-6: Fence Use Allowed by SFHA Sub-Zone FENCE TYPE | FLOOD FRINGE Zones A, AE, and AO | FLOODWAY Zone AE | SHALLOW FLOODING Zone X Open barbed or barbless wire 1 | Yes | Yes, unless the proposed is to contain livestock within a corral | Yes Open pipe or rail fencing (i.e. corrals) 2 | Yes | Yes, with limited cross fencing 4 ; not allowed in main channel | Yes Other wire, pipe, or rail fencing (i.e. field fence, welded wire, chicken wire) 3 | Yes, if elevated to or above the flood height | Case by case review | Yes, if elevated to or above the flood height Chain link | Case by case review | No | Yes Picket fencing (50% opaque 5 ) | Case by case review | No | Yes Alternating board/shadow box (80% opaque) | Case by case review | No | Yes Solid board fencing or masonry walls | Case by case review - design required | No | Yes, if elevated to or above flood height or adequate openings are provided 4 Collapsible or breakaway fencing | Case by case review-design required TABLE NOTES: 1 Barbed or barbless wire is considered open if there is no more than one horizontal strand per foot of height and no more than one vertical wire or post every six feet. 2 Open pipe or rail fencing shall be 90% open and have posts placed no closer than eight feet part. 3 Other wire, pipe, or rail fencing that is not considered "open" shall include minimum spacing of not less than six-inch by six-inch square openings. 4 Determination of cross-fencing requirement and/or adequate opening size and number shall be made by the Floodplain Administrator. Adequate openings shall allow the free-flow of floodwaters without increasing the depth of water at all. 5 Opacity is the degree to which light or views are blocked. With reference to fencing, it is measured perpendicular to the fence for each fence section between supports. F. Subdivision Proposals. 1. All subdivision proposals and other new development, including manufactured home parks or subdivisions, shall be reviewed by the appropriate City officials to determine whether the proposed development will be reasonably safe from flooding. Any such proposals in the Regulatory Floodplain shall be reviewed to ensure that: a. The proposal is consistent with the need to minimize flood damage; b. The proposal has public utilities and facilities such as sewer, gas, electrical, and water systems located and constructed to minimize flood damage; c. The proposal has adequate drainage provided to reduce exposure to flood damage; and d. Base flood elevation data is provided. All subdivision proposals and other proposed developments (including proposals for manufactured home parks and subdivisions) greater than 50 lots or 5 acres, whichever is lesser, shall include within such proposals base flood elevation data. G. Flood-Proofing. All-flood proofing measures mandated in this Section shall be subject to the requirements of this Code regarding the establishment of floodplain development permits, and regarding nonresidential structures. A professional engineer registered in the State of Colorado shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions of this Section and the design is consistent with the flood protection elevations for the particular area as shown by the flood profile, flood velocities, and other factors associated with the flood protection elevation. Such certifications shall be provided to the Floodplain Administrator as set forth in subsection 8-1-1-4, Floodplain Administrator. In addition to the flood-proofing measures described elsewhere in this Section, others may include: 1. Installation of watertight doors, bulkheads and shutters, 2. Reinforcement of walls to resist water pressure, 3. Use of paints, membranes, or mortars to reduce seepage of water through walls, 4. Addition of mass or weight to structures to resist flotation, 5. Installation of pumps to lower water levels in structures, 6. Addition or design of pumping facilities for subsurface drainage systems of buildings to relieve external foundation, wall, and basement floor pressures, 7. Construction to resist rupture or collapse caused by water pressure or floating debris, and 8. Installation of cutoff valves on sewer lines or the elimination of gravity flow basement drains.

(Ord. No. 4867, § 2, 2-12-2024; Ord. No. 4905, § 30, 8-19-2025)

Ask a question about Arvada law

Corpus searches the Arvada sections it holds and shows the ones that match, with their citations. Free, no sign-in.