Sec. 78-303. - Traffic control.
(a) When it is necessary to obstruct vehicular or pedestrian traffic or work within the public right-of-way, a traffic control plan shall be submitted to the city traffic engineer at the time of permit application, or with permission of the city traffic engineer, no fewer than two working days prior to the start of work. The traffic control plan shall conform to all requirements of the most current edition of the Manual on Uniform Traffic Control Devices, city requirements, rules, ordinances, and regulations or as modified by the city traffic engineer. No permit will be issued until the city traffic engineer approves the plan. No permittee shall block access to and from private property, block emergency vehicles, block access to fire hydrants, fire stations, fire escapes, water valves, underground vaults, valve housing structures, or any other vital equipment unless the permittee provides the city public works department and fire department with verification of written notice delivered to the owner or occupant of the facility, equipment, or property at least 72 hours in advance. If a street closing is desired, the applicant shall obtain the approval of the traffic engineer. It shall be the responsibility of the permittee to notify and coordinate all work in the public way with police, fire, ambulance, other government entities, transit organizations, residents, and others as directed by the city traffic engineer. (b) Nonemergency work requiring complete road closure may necessitate advance notice to adjacent or nearby property owners and road users. Permittees shall consult with the city traffic engineer no later than 30 days in advance of the road closure to ensure that adequate notice is provided. Failure to do so may result in a delay of the project. (c) Unless approved by the director, the permittee shall not impede peak hour traffic on arterial or collector streets. No construction shall be performed nor shall any traffic lane be closed to traffic without the approval of the director. It is generally considered that work may be permitted on these streets between the hours of 8:30 a.m. and 3:30 p.m. No work, cleanup, set-up, or other work-related activity would be allowed outside of these hours unless approval is granted by the city traffic engineer. There shall be no construction between 9:00 p.m. and 7:00 a.m. unless it is an emergency or is authorized by the city manager. Any permittee who interferes with any lanes of traffic outside of approved work hours may be assessed a travel disruption fee, as adopted by city council resolution. Illumination and traffic control for night work must conform to the city's requirements as set forth by the city traffic engineer. (d) Traffic control devices must conform to the most current edition of the Manual on Uniform Traffic Control Devices, Work Zone Traffic Control, and must be used whenever it is necessary to close a traffic lane or sidewalk or work in any public right-of-way. Traffic control devices shall be supplied by the permittee. If used at night, they must be reflectorized and must be illuminated or have barricade warning lights in accordance with the director or the city traffic engineer. (e) The contractor shall be responsible for maintaining all work area signing and barricading during construction operations, as well as any signs and barricades that are needed to protect roadway users and pedestrians during nonwork hours. All traffic control signs that are not applicable to the given circumstance shall be removed, covered, or turned around so that they do not face traffic and do not pose a hazard. The contractor shall correct any deficiencies noted by the city immediately. (f) If the contractor does not comply following 48 hours notice, is not available, or cannot be found, the city may make such corrections and the contractor shall pay the actual cost plus a penalty of 50 percent of the amount thereof. The contractor must remove all traffic control within 48 hours after job completion. Any traffic control not removed by the contractor shall be removed by the city, with such work being billed to the permittee at overtime rates. The permittee shall pay all charges within 30 days of the statement date. If the permittee fails to pay such charges within the prescribed time period, the city may, in addition to taking other collection remedies, seek reimbursement through the warranty guarantee. (g) A utility permittee may undertake routine maintenance on existing facilities as described in section 78-294(f) if a traffic control plan is on file in the office of the city traffic engineer. The traffic control plan shall be maintained on the job site and available for inspection upon request by any officer or employee of the city.
(Code 1981, § 27-212; Ord. No. 3717, § 1, 8-27-2001)
Ask a question about Arvada law
Corpus searches the Arvada sections it holds and shows the ones that match, with their citations. Free, no sign-in.