Sec. 78-308. - Construction and restoration standards for newly constructed or overlayed streets.

No person shall cause an open trench excavation or potholing of utilities in the pavement of any public right-of-way for a period of three years from the completion of construction or resurfacing, except in compliance with the provisions of this section. (1) Application. Any application for a permit to excavate in a public right-of-way, subject to the requirements of this section, shall contain the following information: a. A detailed and dimensional engineering plan that identifies and accurately represents the city rights-of-way or property that will be impacted by the proposed excavation, as well as adjacent streets, and the method of construction; b. The street width or alley width, including curb and gutter, over the total length of each city block that will be impacted by the proposed excavation; c. The location, width, length, and depth of the proposed excavation; d. The total area of existing street or alley pavement in each individual city block that will be impacted by the proposed excavation; and e. A written statement addressing the criteria for approval. (2) Criteria for approval. No permit for excavation in the right-of-way of new streets shall be approved unless the director finds that all of the following criteria have been met: a. Boring or jacking without disturbing the pavement is not practical due to physical characteristics of the street or alley or other utility conflicts; b. Alternative utility alignments that do not involve excavating the street or alley are found to be impracticable; and c. The proposed excavation cannot reasonably be delayed until after the three-year deferment period has lapsed. (3) Exemptions for emergency operations. Emergency maintenance operations shall be limited to circumstances involving the preservation of life, property, or the restoration of customer service. Persons with prior authorization from the city to perform emergency maintenance operations within the public rights-of-way shall be exempted from this section. Any person commencing emergency maintenance operations shall submit detailed engineering plans, construction methods, and remediation plans no later than the next working day after initiating the emergency maintenance operation. All emergency work shall require prior telephone notification to the city police department and the appropriate fire protection agency. (4) Construction and restoration standards for newly constructed or overlayed streets and alleys. The streets shall be restored and repaired in accordance with design and construction standards adopted by the city in accordance with the provisions of article IV of this chapter (Engineering Code of Standards and Specifications), as amended.

(Code 1981, § 27-217; Ord. No. 3717, § 1, 8-27-2001)