For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 9-3-2 — Floodplains

Boulder Revised Code 1981 (Supplement167; ordinances effective through July30,2026; five publisher-pending ordinances held); partial · Boulder Revised Code 1981 § 9-3-2

Corpus is an independent public-information project, not the official City of Boulder website. Stable reference: corpuslaw.us/code/0692b284-ae03-4de7-bf65-a22992f80699

9-3-2. - Floodplains.

(a) Legislative Intent: The purpose of this chapter is to regulate certain areas of the city subject to flooding in order to protect the public health, safety, and welfare by: (1) Restricting or prohibiting certain uses that are hazardous to life or property in time of flood; (2) Restricting the location of structures intended for human occupancy and regulating the manner in which such structures may be built in order to minimize danger to human life within and around such structures; (3) Requiring that those structures allowed in the floodplain be expanded or enlarged, and equipment and fixtures be installed or replaced, in a manner designed to prevent their being washed away and to assure their protection from severe damage; (4) Regulating the method of construction and replacement of water supply and sanitation systems in order to prevent disease, contamination, and unsanitary conditions; (5) Maintaining for public inspection available maps delineating areas subject to such provisions in order to protect individuals from purchasing or using lands for purposes that are not suitable; (6) Protecting and preserving the water-carrying and water-retention characteristics and capacities of watercourses used for conveying and retaining floodwaters; and (7) Obtaining and maintaining the benefits to the community of participating in the National Flood Insurance Program. (b) Flooding May Occur: The degree of flood protection provided by the terms of this chapter has been determined to be reasonable for regulatory purposes. Floods of greater magnitude will occur, and flood heights may be increased as a result of natural or human-made causes. The provisions of this chapter do not imply that areas outside of the floodplain or land uses permitted within the floodplain are free from flooding, flood hazard, or flood damages. A grant or approval by the city under the requirements of this chapter does not constitute a representation, guarantee, or warranty of any kind or nature by the city or any city official or employee of the practicability or safety of any structure or proposed use, and it creates no liability to or cause of action against the city or any city official or employee for any damages from flood or otherwise that may result from such structure or use. (c) Scope and Application: (1) The requirements of this chapter supplement those imposed on the same lands by any underlying zoning provisions of this code or other ordinance of the city. If there is a conflict between such requirements, the more restrictive controls. (2) If a lot or parcel of land lies partly within the high hazard zone, the conveyance zone, the one hundred-year floodplain, or the five hundred-year floodplain, the part of such lot or parcel lying within such area shall meet all the standards and requirements of such respective area as prescribed by this chapter. If any portion of a structure lies partly within the high hazard zone, the conveyance zone, the one hundred-year floodplain, or the five hundred-year floodplain, all the standards and requirements of such respective area(s) as prescribed by this chapter shall apply to the entire structure unless stated otherwise. (3) If lands located outside the city limits are included within the five hundred-year floodplain, the one hundred-year floodplain, the conveyance zone, or the high hazard zone, the requirements of this chapter shall apply to such lands upon annexation. (d) Administration: The city manager shall administer the requirements of this chapter and shall: (1) Determine that the requirements of this chapter have been met before issuing any permit for development in the floodplain; (2) Obtain and maintain for public inspection any certificates of floodproofing required by this chapter, and any information on the elevation (in relation to mean sea level) of the lowest floor (including basement) of all new or substantially improved structures and information specifying whether such structures contain a basement, and, if the structure has been floodproofed, the elevation (in relation to mean sea level) to which the structure was floodproofed; (3) Notify Boulder County and the Colorado Water Conservation Board before permitting any change in a watercourse and submit evidence of such notice to FEMA; (4) Adopt rules interpreting and implementing the requirements of this chapter, including without limitation, application procedures for floodplain development permits; specifications for the floodproofing of structures, substantial improvements, and utilities; and specifications for the content of and application procedures for emergency management plans; (5) Assure that the Boulder Valley Comprehensive Plan is consistent with the floodplain management objectives of this chapter and the regulations of FEMA; (6) Make necessary interpretations of the exact location of the boundaries of the floodplain, the five hundred-year floodplain, the one hundred-year floodplain, the conveyance zone, and the high hazard zone; (7) Amend the boundaries of the high hazard zone and the conveyance zone pursuant to Subsection (f) of this section; (8) Determine that all necessary permits have been obtained from state, federal, or local agencies the approval of which is required before issuing any permit for development in the floodplain; (9) Require that persons changing a watercourse maintain the watercourse so that its flood-carrying capacity is not diminished; (10) Require that new and replacement water supply systems in the floodplain be designed to minimize or eliminate infiltration of floodwaters into the systems; (11) Require that new and replacement sanitary sewage systems within the floodplain be designed to minimize or eliminate infiltration of floodwaters into the systems and discharges from the systems into floodwaters; (12) Require that on-site waste disposal systems be located to avoid impairment to them or contamination from them during flooding; and (13) Obtain, review, and reasonably utilize any flood elevation and floodway data available from federal, state, and other sources, including data developed pursuant to Chapter 9-12, "Subdivision," B.R.C. 1981, as criteria for requiring that all new development meet the requirements of this chapter. (e) Appeals: Any person contesting the city manager's interpretation of a boundary location under Paragraph (d)(6) of this section, or any person aggrieved by the granting or denial of a floodplain development permit, may appeal such determination to the planning board through the process described in Section 9-4-4, "Appeals, Call-Ups, and Public Hearings," B.R.C. 1981. The request shall set forth the reason and basis for the appeal and such other information as the manager may prescribe by rule. (f) Map Amendments: As watercourse or flood channel improvements or mapping corrections are made, the city manager may amend the flood regulatory area maps to recognize the changed conditions produced by such improvements or corrections, provided that no such amendments or corrections may change a FEMA "area of special flood hazard" or "regulatory floodway" unless the city is in receipt of a letter of map amendment or a letter of map revision issued by FEMA. (g) Flood Regulatory Areas: (1) The provisions of this chapter apply to the area shown as floodplain on the most recent maps adopted by the city council, as amended from time to time by the city manager pursuant to Subsections (d), (e), and (f) of this section. The regulatory floodplain encompasses the five hundred-year floodplain, the one hundred-year floodplain, the conveyance zone, and the high hazard zone. The following regulations governing each portion of the floodplain are cumulative and not exclusive. (2) In addition to the regulatory areas identified in Paragraph (g)(1) of this section, the city has adopted the areas of special flood hazard identified in the Flood Insurance Study for Boulder County, Colorado, and Incorporated Areas; dated October 24, 2024, and delineated on the Flood Insurance Rate Map for Boulder County, Colorado, and Incorporated Areas; dated October 24, 2024, as adopted by the City in compliance with 44 C.F.R. chapter 1. In no event will the regulations contained in this chapter be interpreted to permit any action not permitted under those regulations promulgated by FEMA for the regulation of areas of special flood hazard and regulatory floodways. (h) Floodproofing: Whenever this chapter requires floodproofing a building or structure or a portion thereof, the following standards shall be met: (1) Such building or structure or portion thereof shall be floodproofed in accordance with any rules adopted by the city manager for floodproofing and with current state and federal laws and regulations governing floodproofing; (2) Such building or structure or portion thereof shall be floodproofed to the flood protection elevation in such a manner that the building or structure is watertight with walls substantially impermeable to the passage of water and in a manner requiring no human intervention; (3) Such building or structure or portion thereof shall have structural components capable of resisting projected hydrostatic and hydrodynamic loads and the effects of buoyancy; and (4) Such floodproofing shall be certified by a Colorado registered professional engineer or registered architect to comply with this paragraph. Such certifications shall be provided to the city manager as set forth in Paragraph 9-3-2(d)(2), B.R.C. 1981. (i) Standards for Critical Facilities and Lodging Facilities in the Five Hundred-Year Floodplain: (1) Floodplain Development Permit: In the five hundred-year floodplain, no person shall construct or establish a new critical facility or make any development to a structure housing an existing critical facility prior to issuance of a floodplain development permit pursuant to Section 9-3-6, "Floodplain Development Permits," B.R.C. 1981, unless the activity is exempt under Subsection 9-3-6(a), "Activities Exempt from Floodplain Development Permit Requirement," B.R.C. 1981. (2) Requirements Apply to Entire Building: If any portion of a structure housing a critical facility or lodging facility lies partially within the five hundred-year floodplain, the requirements of this section shall apply to that entire structure. (3) Emergency Management Plans: (A) Emergency Management Plan Required: No owner or operator of a critical facility or lodging facility in the five hundred-year floodplain shall fail to develop and have approved an emergency management plan meeting the requirements of this subsection prior to issuance of any floodplain development permit for any development requiring a floodplain development permit but no later than January 1, 2019, or five years after the effective date of a map change that placed the facility into the five hundred-year floodplain, if that date is later than January 1, 2019. (B) Floodplain Development Permit: To obtain the required approval of an emergency management plan, an owner or operator of a critical facility or lodging facility in the five hundred-year floodplain shall file an application for floodplain development permit pursuant to Section 9-3-6, "Floodplain Development Permits," B.R.C. 1981. (C) Purpose: The purpose of the emergency management plan requirements set forth in this section is: i. To protect the health, safety, and welfare of the public and of employees, visitors, residents, guests, contractors, and others at risk from hazards at the facility; ii. To minimize interruptions or disruptions of operations of critical facilities; iii. To protect buildings, physical assets, and electronic information; and iv. To prevent environmental contamination. (D) Emergency Management Plan Requirements: With the exception of requirements the city manager finds inapplicable to a particular facility, all emergency management plans shall contain, without limitation: i. An assessment by a Colorado registered professional engineer or an International Facility Management Association Certified Facilities Manager of the risks to persons at the facility and others at risk from hazards at the facility, to the facility itself, its physical assets, and its operation, and to the environment during flood events; ii. An assessment of the resources needed for responding to the risk of flood events and for continuing business operations and for communicating during and after an incident; iii. A plan for obtaining and maintaining the resources identified as needed in Subparagraph (i)(3)(C)ii. above; iv. A plan to protect employees, visitors, residents, guests, contractors, and others at risk from hazards at the facility during flood events. Such plan shall include an evacuation plan or a shelter-in-place plan, unless both are necessary to protect the health, safety, and welfare of the persons at risk at the facility. a. Evacuation plans shall be certified by a Colorado registered professional engineer or an International Facility Management Association Certified Facilities Manager and shall provide a means for safely evacuating occupants to a location outside of the five hundred-year floodplain or to an approved shelter-in-place location. b. Shelter-in-place plans shall be certified by a Colorado registered professional engineer, shall demonstrate that the structure will be safe to occupy during a five hundred-year flood event, and shall designate a safe shelter-in-place location within the building and safe routes to such location. v. A system and strategies to communicate with employees, customers, residents, guests, contractors, and others at risk at the facility during a flood event; vi. Strategies to minimize and quickly overcome any disruption or interruption of operations of the facility during a flood event; vii. An incident management system that defines responsibilities and coordinates activities before, during, and after a flood event; viii. A program to train persons with defined roles in the management plan to do their assigned tasks and to train all employees and other regular occupants of the facility so they can take appropriate protective actions during a flood event; and ix. Any other strategies, techniques, systems, programs, or plans the city manager determines are necessary to serve the health, safety, and welfare of the public and any persons at or near the facility. (E) Posting of Evaluation Routes and Routes to Shelter-In-Place Locations: The approved evacuation routes and routes to shelter-in-place locations shall be posted on the inside of each doorway leading to a separate unit in a lodging facility and be displayed in a prominent location or a location designed to provide information to persons within the critical facility that is approved by the city manager. (F) Implementation of Emergency Management Plans: No owner or operator of a critical facility or lodging facility in the five hundred-year floodplain shall fail to implement and to annually review and update, if necessary, an approved emergency management plan and to make the plan available to the city manager for review upon request. (4) Construction Requirements for Critical Facilities in the Five Hundred-Year Floodplain. The following standards apply to critical facilities located in the five hundred-year floodplain: (A) No owner or operator of a critical facility shall construct, modify, or establish, or cause to be constructed, modified, or established, a critical facility within the five hundred-year floodplain except in compliance with the requirements of this subsection. (B) Any person making an expansion or an enlargement to a structure housing an existing at-risk population facility or essential service facility shall floodproof or elevate the lowest floor, including the basement, of the expanded or enlarged portion to or above the flood protection elevation. (C) Any person making a substantial modification or a substantial improvement to a structure housing an existing at-risk population facility or essential service facility shall floodproof or elevate the lowest floor, including the basement, of the substantially modified or improved portion to or above the flood protection elevation and shall floodproof or elevate the remainder of the existing structure to or above the flood protection elevation. (D) Any person constructing or establishing a new at-risk population facility or essential service facility shall floodproof or elevate the lowest floor, including the basement, to or above the flood protection elevation. (E) Any person constructing or establishing a new hazardous material facility shall secure all hazardous materials from flooding and from being released during a five hundred-year flood event or shall floodproof the facility. Any person making a substantial modification or a substantial improvement to a structure housing an existing hazardous material shall secure the hazardous materials from flooding or otherwise being released during a five hundred-year flood event. The owner or operator shall demonstrate compliance with this standard by providing a certification from a Colorado registered professional engineer that documents that hazardous material will not be released at or from the facility during a five hundred-year flood event. (F) No person owning, operating, or otherwise using a hazardous material facility shall fail to secure all hazardous materials from flooding and from being released during five hundred-year flood events or to floodproof the facility before January 2024 or five years after the effective date of a map change that placed the facility into the five hundred-year floodplain, whichever date is later. (G) Whenever any construction, modification, improvement, or other activity related to a critical facility triggers any floodproofing or elevation requirements of this Paragraph (4), the construction standards described in Paragraphs (a)(3) "Construction Materials and Methods," (a)(4) "Utilities," (a)(18) "Enclosures," and (a)(19) "Below Grade Crawl Space Construction," of Section 9-3-3, "Regulations Governing the One-Hundred-Year Floodplain," B.R.C. 1981, shall also be complied with. (H) Existing Uses: The use of any land or structure that was lawful before the application of this paragraph, Construction Requirements for Critical Facilities in the Five Hundred-Year Floodplain, or any amendment thereto but that does not conform to the requirements of this paragraph may be continued subject to the requirements of this paragraph. If such a use not conforming to the requirements of this paragraph is discontinued for twelve consecutive months, no person shall use the land or structure thereafter unless such use conforms to the requirements of this paragraph. (5) Exemption for Critical Facilities Protected by Levee System: Critical facilities protected by a levee system within the five hundred-year floodplain are exempt from the requirements of Paragraph (i)(4) above, provided that the following requirements are satisfied: (A) The owner or operator of a new or existing critical facility located landward of a levee system outside of the one hundred-year floodplain, but within the five hundred-year floodplain, demonstrates that the levee system provides protection against a five hundred-year flood event by: i. meeting the riverine levee design criteria of 44 C.F.R. § 65.10, as amended from time to time, except that the minimum riverine levee freeboard shall be one foot above the water surface elevation of a five hundred-year flood, rather than three; and ii. providing an operating and maintenance manual for the levee that incorporates all operating and maintenance requirements of 44 C.F.R. § 65.10 and Rule 10 of the Colorado Rules and Regulations for Regulatory Floodplains in Colorado (2 C.C.R. 408-1:10, Criteria for Determining Effects of Levees on Regulatory Floodplains), as amended from time to time, to ensure continuing proper function of the structure. (B) The owner or operator of a new or existing critical facility located landward of an accredited levee or a provisionally accredited levee within areas mapped Zone X (shaded) shall demonstrate that the levee system meets the riverine levee design, operation, and maintenance criteria of 44 C.F.R. § 65.10 and Rule 10 of the Colorado Rules and Regulations for Regulatory Floodplains in Colorado (2 C.C.R. 408-1:10, Criteria for Determining Effects of Levees on Regulatory Floodplains). (C) If the levee is owned by a person other than the owner or operator of the critical facility, the owner or operator, respectively, must demonstrate that a fully executed agreement exists between the levee owner and the owner or operator of the critical facility ensuring that the requirements of Subparagraphs 9-3-2(i)(5)(A) or (B) and (F) for continued operation and maintenance of the levee system will be met. (D) The exemptions under this Paragraph (i)(5) for critical facilities located landward of an levee system were approved by the city manager through the issuance of a floodplain development permit pursuant to Subsection 9-3-6, "Floodplain Development Permits," B.R.C. 1981, after finding that all requirements of this Paragraph (i)(5) have been met. (E) If a levee system protecting an existing critical facility in the five hundred-year floodplain fails to meet the freeboard requirement of Subparagraph (i)(5)(A) of this section solely because FEMA revises a FIRM, maintenance and use of that critical facility may occur for two years after the revision before having to meet the requirements of Paragraphs (i)(3) and (i)(4) of this section. (F) No person shall fail to construct, operate, or maintain or fail to cause the construction, operation, or maintenance of a levee system protecting a critical facility and approved by the city manager in a floodplain development permit as an exemption to the requirements of Paragraphs (i)(3) and (i)(4) of this section in accordance with a design and an operating and maintenance manual meeting the requirements of this Paragraph (i)(5). (6) As the one hundred-year floodplain, conveyance zone, and high hazard zone are all located within the five hundred-year floodplain, the requirements of this Subsection 9-3-2(i), "Standards for Critical Facilities and Lodging Facilities in the Five Hundred-Year Floodplain," also apply to critical facilities and lodging facilities in the one hundred-year floodplain, conveyance zone, and high hazard zone unless stricter requirements apply in the one hundred-year floodplain, conveyance zone, or high hazard zone, as applicable. Ordinance Nos. 6034 (1998); 7522 (2007); 7756 (2010; 7866 (2012); 7926 (2013); 8204 (2017); 8649 (2024); 8671 (2024)

Ask a question about Boulder law

Corpus searches the Boulder sections it holds and shows the ones that match, with their citations. Free, no sign-in.