9-3-6. - Floodplain Development Permits.
(a) Activities Exempt from Floodplain Development Permit Requirement: The following activities are allowed within the one hundred-year floodplain and in the five hundred-year floodplain and do not require a floodplain development permit: (1) Maintenance, as defined in Section 9-16-1, "General Definitions," B.R.C. 1981, that does not affect the efficiency or capacity of the conveyance zone or high hazard zone. (2) Sidewalks, concrete, asphalt, or stone flatwork that does not result in the establishment or expansion of parking area and does not modify existing grade by more than six inches. (3) Underground utilities that do not modify existing grade. (4) Poles, lines, cables, sign posts, landscaping, and artwork that do not affect the efficiency or capacity of the conveyance zone or high hazard zone. (5) Temporary facilities that are not permanently attached to the ground, such as tents, traffic control devices, and lawn furniture, provided that they will not affect the efficiency or capacity of the conveyance zone or high hazard zone, or they will remain in place for no more than thirty days. (b) An applicant for a floodplain development permit shall pay the fee prescribed by Section 4-20-44, "Floodplain Development Permits and Flood Control Variance Fees," B.R.C. 1981, and shall complete an application form provided by the city manager that shall include, without limitation, the following: (1) The written consent of the owners of all property subject to the development request; (2) A written statement addressing the criteria for approval; (3) Information on the location of hazardous material and how it will be secured to prevent its release during a five hundred-year flood event, if the floodplain development permit application is for a critical facility which will contain hazardous material; (4) A copy of the emergency management plan, if the floodplain development permit application is for a critical facility or lodging facility; and (5) A written statement by a Colorado registered professional engineer certifying that the proposed levee design and operating and maintenance manual meet the requirements of Paragraph 9-3-2(i)(5), "Exemption for Critical Facilities Protected by Levee System," B.R.C. 1981, if the flood development permit application is for a critical facility or lodging facility for which an exemption is sought under Paragraph 9-3-2(i)(5). (c) The manager may require the applicant to furnish additional information and details deemed necessary to evaluate the effects of the proposed construction upon the floodplain or to determine whether the requirements of this chapter have been met, including, without limitation: (1) A surface view plan showing elevations and contours of the ground; pertinent structures, fill, and storage elevations; sizes, locations, and spatial arrangements of all proposed, anticipated, and existing structures on the site; location and elevations of streets, water supplies, and sanitary facilities; and soil types; (2) Specifications for building construction and materials, filling, dredging, grading, channel improvements and changes, storage of materials, water supply, and sanitary facilities; (3) Valley cross sections showing the floodplain surrounding the watercourse, cross sections of the area to be occupied by the proposed development, one hundred-year flood maximum water surface elevation information, and, for critical facilities and lodging facilities, five hundred-year flood maximum water surface elevation information; (4) A profile showing the slope of the bottom of the channel or thalweg of the watercourse; (5) A floodplain analysis by a Colorado registered professional engineer of the flood profile, elevation, and velocity, using methodology acceptable to FEMA, including existing and anticipated uses, and making a determination that the proposed construction or development will not cause a rise in the elevation of the water surface of a one hundred-year flood; and (6) A structural analysis by a Colorado registered professional engineer showing that any proposed structures will be adequately designed and constructed to prevent flotation, collapse, or lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy and scouring. (d) When reviewing an application for a permit, the city manager shall determine which portions of the floodplain are affected by the particular development request and shall then apply the provisions of Sections 9-3-2, "Floodplains," 9-3-3, "Regulations Governing the One Hundred-Year Floodplain," 9-3-4, "Regulations Governing the Conveyance Zone," and 9-3-5, "Regulations Governing the High Hazard Zone," B.R.C. 1981, as applicable. The manager also shall determine whether the application meets the intent of this chapter prescribed by Subsection 9-3-2(a), B.R.C. 1981, after considering the following factors: (1) The effects upon the efficiency or capacity of the conveyance zone and high hazard zone; (2) The effects upon lands upstream, downstream, and in the immediate vicinity; (3) The effects upon the one hundred-year flood profile; (4) The effects upon any tributaries to the main stream, drainage ditches, and any other drainage facilities or systems; (5) Whether additional public expenditures for flood protection or prevention will be required; (6) Whether the proposed use is for human occupancy; (7) The potential danger to persons upstream, downstream, and in the immediate vicinity; (8) Whether any proposed changes in a watercourse will have an adverse environmental effect on the watercourse, including, without limitation, stream banks and streamside trees and vegetation; (9) Whether any proposed water supply and sanitation systems and other utility systems can prevent disease, contamination, and unsanitary or hazardous conditions during a flood; (10) Whether any proposed facility and its contents will be susceptible to flood damage and the effect of such damage; (11) The relationship of the proposed development to the Boulder Valley Comprehensive Plan and any applicable floodplain management programs; (12) Whether safe access is available to the property in times of flood for ordinary and emergency vehicles; (13) Whether the applicant will provide flood warning systems to notify floodplain occupants of impending floods; (14) Whether the cumulative effect of the proposed development with other existing and anticipated uses will increase flood heights; and (15) Whether the expected heights, velocities, duration, rate of rise, and sediment transport of the floodwaters expected at the site will adversely affect the development or surrounding property. (e) If the city manager determines that the applicant meets the purposes and requirements of this chapter, the manager shall issue the permit and may attach such conditions as deemed necessary to further the purposes of this chapter. (f) Every permit issued on or after April 7, 1985, shall become invalid if the work authorized by such permit is not completed and approved by the city manager within three years from the date such permit was issued. Upon receipt of a request in writing that demonstrates justifiable cause and is received prior to expiration of the permit, the city manager may grant in writing one or more extensions of time for periods not more than 180 days each. As part of an approval of extension of a permit, the city manager may impose additional conditions on the applicant in order to ensure compliance with any amendments to this chapter or the floodplain mapping effective after the date of the original permit approval. (g) No person who has obtained a permit shall fail to construct in accordance with their approved application and design. (h) Floodplain development permits that allow for development in the conveyance zone or the high hazard zone, or which will involve a change of watercourse, shall be decided by the city manager. The decision of the city manager may be appealed by any aggrieved party to the planning board, subject to the appeal procedure of Section 9-4-4, "Appeals, Call-Ups, and Public Hearings," B.R.C. 1981. (i) A floodplain development permit for any of the following items is effective upon the date of its issuance: (1) Sidewalks, parking lots, or other concrete, asphalt, or stone flatwork that do not modify existing grade; (2) Uninhabited overhead structural projections, no portion of which extends below the flood protection elevation; or (3) Rehabilitation of an existing structure in accordance with the definitions in Chapter 9-16, "Definitions," B.R.C. 1981. In addition, for properties in the high hazard zone, the rehabilitation shall not result in a prohibited change in use as set forth in Subsection 9-3-5(c), B.R.C. 1981. (j) No person shall initiate any use after obtaining a permit under this section without first submitting to the city manager a certification by a Colorado registered professional engineer that the development has been completed in compliance with the approved permit application and that all conditions have been fulfilled. (k) At least once every three years, the owner or operator of a critical facility protected by a levee for which the city manager approved an exemption under Paragraph 9-3-2(i)(5), "Exemption for Critical Facilities Protected by Levee System," B.R.C. 1981, in a floodplain development permit, shall file with the city manager a written certification from a Colorado registered professional engineer that the levee meets the minimum freeboard requirements set forth in Paragraph 9-3-2(i)(5) and that the levee appears, on visual inspection, to be structurally sound and adequately maintained. The city manager may require the owner or operator to submit such certification more frequently than once every three years if warranted by recent flood conditions or circumstances that may lead to changes in the levee system at the critical facility. The permit expires if the certification required pursuant to this subsection is not filed with the city manager. Once a floodplain development permit has been issued granting an exemption under Paragraph 9-3-2(i)(5), for a critical facility protected by a levee system, future development on the land protected by the levee system that does not in any way affect the levee system or its operation and maintenance shall not require a floodplain development permit so long as the requirements of this Subsection and Paragraph 9-3-2(i)(5), B.R.C. 1981, are met. Ordinance Nos. 6034 (1998); 7756 (2010); 7926 (2013); 8622 (2024)
Ask a question about Boulder law
Corpus searches the Boulder sections it holds and shows the ones that match, with their citations. Free, no sign-in.