§ 14-2-30 — Definitions
Municipal Code of the City of Brighton, Colorado (Codified through Ordinance No. 2508, adopted June 16, 2026. (Supp. No. 26, Update 2)) · Brighton Municipal Code § 14-2-30
Corpus is an independent public-information project, not the official City of Brighton website. Stable reference: corpuslaw.us/code/a5f09f9f-9699-4f0d-902f-7540e3307315
Sec. 14-2-30. - Definitions.
All definitions contained in this Chapter are hereby adopted and made applicable to this Article, and in addition thereto, the definitions stated herein shall apply except where the context clearly indicates a different meaning: Applicant means a landowner, builder or developer, or agent thereof, who has filed an application for the subdivision or development of lands within the City and/or an application for an erosion and sediment control (ESC) permit, and may be referred to as the permittee. Best Management Practices (orBMPs) means the customary and accepted practices and activities designed to prevent or reduce the pollution of waters and minimize the impacts of development through the use of nonstructural and structural devices, including prevention activities, treatment requirements, operating procedures, maintenance practices and educational programs, such as are customarily implemented before, during and after pollution-producing activities, that are intended to reduce or eliminate the introduction of pollutants into receiving waters. Most structural BMPs are designed to manage and/or treat stormwater runoff before it reaches a waterway, pond or lake. Examples of structural BMPs include, but are not limited to, silt fence, inlet protection, sediment basins, etc. Builder means a person who undertakes construction activities or other development upon lands within the City, and may be referred to as the permittee. Compliance order means an administrative order issued by the Director directing a person subject to this Article to comply with the provisions of this Article or a permit issued hereunder. Such order may include a compliance schedule involving specific actions to be completed by the applicant or permittee within a specific follow-up inspection time period. Compliance schedule means an enforceable schedule included in the compliance order specifying a date or dates by which the Director must reinspect to ensure compliance with a pretreatment standard, requirement, prohibition or limitation. Construction activities means any ground surface disturbing activities which include, but are not limited to, clearing, grading, excavation, demolition, installation of new or improved haul roads and access roads, staging areas, stockpiling of fill material and borrow areas. Construction activities does not include routine maintenance to maintain original line and grade, hydraulic capacity or original purpose of the facility. Construction site operator means a person who has been designated by the applicant, builder, developer or permittee to properly oversee BMPs and who is responsible for ensuring that the structural integrity of such BMPs are constructed and maintained pursuant to this Article, and that such structures otherwise perform as designed and as required by this Article. Department means the Utilities Department, unless otherwise specified. Developer means a person who undertakes subdivision, development, construction or other land disturbance activity subject to this Article, and may be referred to as the applicant or permittee. Development means any application for, or the undertaking of, any activity, excavation, grading, fill, alteration, subdivision, change in land use or construction that is planned, undertaken or requested which may affect the discharge of stormwater runoff upon lands within the City. The term development does not necessarily include the routine maintenance of existing stormwater runoff facilities. Director means the Director of the Utilities Department, unless otherwise specified. Disturbed area means any area of land surface disturbed by any work activity upon lands within the City, by means of grading, excavating, moving, removing or stockpiling soil, fill or other material, clearing, vegetation removal or removal or deposit of any rock, soil or other materials, including but not limited to other activity that exposes or disturbs soil. Disturbed area does not include routine maintenance to maintain original line and grade, hydraulic capacity or original purpose of the facility, residential gardening or the normal fanning, plowing or tillage of land that is zoned agricultural for agricultural purposes, or the normal farming or tillage of a parcel zoned PUD (planned unit development) within an area specifically identified for agricultural uses, nor does it include the performance of emergency work necessary to remedy or prevent an immediate threat to life, property or the environment. However, any persons performing such emergency work shall immediately notify the Department of the emergency situation and the actions taken in response to such emergency. The Department may in its reasonable discretion require such persons to obtain a grading permit and/or an erosion and sediment control (ESC) permit in order to implement such emergency remedial measures. Drainageway (or waterway) means a permanent or intermittent stream, body of water or structure, either natural or man-made, which gathers, carries or receives stormwater runoff or other surface water. Erosion and sediment control permit (orESC permit) means the permit issued by the City after acceptance of the erosion and sediment control plan (ESCP) by the Director. The ESC permit does not replace or substitute neither the State of Colorado CDPS stormwater discharge permit, nor the Environmental Protection Agency (EPA) NPDES stormwater discharge permit. Erosion and sediment control plan (orESCP) is also referred to as Stormwater Management Plan (SWMP) by the State of Colorado or as Stormwater Pollution Prevention Plan (SWPPP) for construction activities by the EPA, and means a detailed written plan specifying a design to minimize erosion and sediment runoff and water quality issues for a construction site or development from commencement of construction activities until final stabilization is completed. The ESCP shall: (1) identify all potential sources of pollution which may reasonably be expected to affect the quality of stormwater discharges associated with construction activity from the site; (2) describe the BMPs to be used to reduce the pollutants in stormwater discharges associated with construction activity at the site; and (3) ensure that the BMPs are selected and described in accordance with good engineering practices, are properly prepared and are updated to ensure compliance with the terms and conditions of the State of Colorado CDPS stormwater construction permit. Final stabilization means when all ground surface disturbing activities at the construction site have been completed and uniform vegetative cover has been established with an individual plant density of at least seventy percent (70%) of predisturbance levels, or equivalent permanent, physical erosion reduction methods have been employed. Landowner means the legal or beneficial owner of land, including those persons holding the right to purchase or lease such land, or any other person holding proprietary rights in the land. Larger common plan of development or sale means a site where multiple separate and distinct construction activities may be taking place at different times on different schedules, but still under a single plan. This includes phased projects, projects with multiple filings or lots, and projects in a contiguous area that may be unrelated but still under the same contract. If the project is part of a common plan of development or sale, the disturbed area of the entire plan must be used in determining permit requirements, and all portions of the project must be covered. If a common plan of development is completely stabilized such that the entire common plan of development meets the definition of "finally stabilized" and permit coverage for that common plan of development has been terminated, then a new determination of "common plan of development" shall be made for any future construction activities conducted by a different owner(s)/developer(s) that occur within the previously permitted area to determine if permit coverage is needed. However, if the original owner/developer of a common plan of development, that achieved final stabilization and terminated permit coverage, is the one who is restarting construction activities within that development, then any construction activity they are engaged in would be considered part of the original larger common plan of development and therefore require permit coverage if one (1) acre or greater. Note that if the site has never been finally stabilized, then this does not apply as the original development is considered ongoing. Performance security means an irrevocable financial commitment, surety bond, letter of credit or cash deposit submitted to or for the benefit of the City, to ensure fulfillment of the provisions of this Article by a person subject to this Article. Permanent BMPs means those BMPs, including but not limited to an extended detention basin, infiltration pond or rain garden, to be installed and regularly maintained at a site in order to ensure long-term water quality benefits. Person means any natural person or any firm, corporation, partnership, association, entity, legal representative, trustee, estate, limited liability company or any other entity subject to the terms and provisions of this Article. Receiving waters means a river, lake, stream, drainage ditch, wetland or other drainageway or waterway into which stormwater, wastewater or treated effluent is discharged or received. Stop work order means an order issued by the Director which requires that all construction activity on a site must be stopped immediately pending compliance with the provisions of this Article. Stormwater Discharge Permit (SDP), also known as State of Colorado CDPS (Colorado Discharge Permit System) stormwater construction permit, means a permit issued to a landowner, developer, builder, applicant or permittee by the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division, allowing such person to discharge stormwater runoff from a construction site pursuant to the requirements, restrictions and limitations of such SDP. Stormwater runoff means that part of snowfall, rainfall or other precipitation which is not absorbed, transpired, evaporated or left in surface depressions, and which then flows controlled or uncontrolled into a drainageway, waterway or receiving waters. Temporary BMPs means those temporary BMPs, including but not limited to silt fences, straw wattles, vehicle tracking pads, inlet protection, diversions, sediment basins and dewatering structures, to be installed and regularly maintained by the applicant or permittee until the site reaches final stabilization and permanent BMPs are established. Vegetative cover means grasses, shrubs, bushes, trees, ground cover and other plants.
(Ord. 1905 §1, 2006; Ord. 2114 §1, 2011; Ord. 2260 §1, 2017)
Ask a question about Brighton law
Corpus searches the Brighton sections it holds and shows the ones that match, with their citations. Free, no sign-in.
