Sec. 14-2-90. - Construction and maintenance requirements.
(a) All ESC permittees, including developers, builders and landowners, shall be responsible for ensuring that the BMPs identified in the erosion and sediment control plan (ESCP) are properly constructed, installed and maintained in good working order as provided in this Article, the ESC permit application and materials submitted in support thereof, the ESCP and the ESC permit. If the Director determines that the accepted ESCP is inadequate, modifications to correct the deficiencies must be made by the ESC permittee. The ESC permittee must revise the ESCP as construction proceeds, to accurately reflect the conditions and practices at the site. If major changes to the ESCP are needed related to hydrology, then the ESCP must be resubmitted to the Director. If minor changes, such as, but not limited to, BMP substitutions, are needed after initial submittal to the City, then those types of changes can be made directly at the site by the ESC permittee, upon notification to the Director. (b) Developers shall be responsible for ensuring that the following requirements are met and completed to the satisfaction of the Director throughout construction and prior to the release of the performance security: (1) All temporary and/or permanent BMPs installed as part of an accepted ESCP shall be properly maintained in good working order; (2) The site shall be fully developed and stabilized pursuant to the ESCP and/or other written requirements of the Director; (3) Any deficiencies noted by the Director shall be promptly corrected; (4) All temporary BMPs installed as part of the ESCP shall be removed after work on site has been completed, final stabilization has been reached and measures are no longer needed; (5) If individual lots, parcels or areas are sold, transferred or conveyed, the stormwater runoff quality requirements of the ESCP, and other written requirements of the Director pertaining to such individual lots, parcels or areas, shall be disclosed to subsequent purchasers, transferees or new landowners at or before the time of closing of the sale, transfer or conveyance; and (6) All BMPs shall be inspected by the permittee following the State's CDPS Stormwater Construction Permit inspection frequency requirements. A record of all inspections shall be retained on site according to the State's permit requirement and provided to the Director upon request. (c) Builders shall be responsible for ensuring throughout construction that: (1) All temporary and/or permanent BMPs installed prior to the builder's purchase of lots from a landowner or developer as part of an ESCP have been properly maintained and remain in good working order as of the time of closing of the sale or date of transfer or conveyance. (2) If not installed prior to the builder's purchase of individual lots, all temporary and/or permanent BMPs required by the ESCP or other written requirements of the Director shall be installed by the builder immediately upon notice from the Director and maintained until final stabilization is reached; or installed and maintained until the time of sale, transfer or conveyance to any subsequent purchaser or landowner. (3) If individual lots, parcels or areas are sold, transferred or conveyed by the builder to a subsequent purchaser, transferee or entity, the stormwater runoff quality requirements of the ESCP and other written requirements of the Director applicable to individual lots, parcels or particular areas shall be disclosed to subsequent purchasers, transferees or new landowners at or before the closing of the sale, transfer or conveyance. (4) Any deficiencies noted by the Director shall be promptly corrected. (5) All temporary BMPs installed as part of the ESCP shall be removed after work on the site has been completed, final stabilization has been reached and measures are no longer needed. (6) All BMPs shall be inspected by the ESC permittee following the State's CDPS Stormwater Construction Permit inspection frequency requirements. A record of all inspections shall be retained on site according to the State's permit requirement and provided to the Director upon request. (d) Landowners shall be responsible for ensuring that: (1) Any temporary and/or permanent BMPs installed prior to purchase of a lot, parcel or site from a developer, previous landowner and/or builder as part of the implementation of an ESCP are properly maintained and remain in good working order. (2) If not installed prior to individual lot acquisition by any person, individual or entity, all temporary and/or permanent BMPs required by the ESCP or other written requirements of the Director shall be installed by the landowner immediately and maintained until final stabilization is reached. (3) All temporary BMPs shall be removed after work on the site has been completed, final stabilization has been reached and measures are no longer needed.
(Ord. 1905 §1, 2006; Ord. 2114 §1, 2011)
Ask a question about Brighton law
Corpus searches the Brighton sections it holds and shows the ones that match, with their citations. Free, no sign-in.