14-10-050 - Permit application; contents.
(A) Unless otherwise provided in an agreement between the permittee and the city, an applicant for a permit to allow construction, excavation, or work in the public right-of-way under this section shall: (1) File a written application on forms furnished by the city which include the following: a. The date of application and the name and address of the applicant who is the owner or joint owner of the facilities involved; b. The name, address, and telephone number of the developer, contractor, or subcontractor licensed to perform work in the public right-of-way, including the name and telephone number of an individual who will be available at all times during construction; c. A description of the type of construction, excavation, or work to be done, and purpose for which it is being done; d. A plan for storage of equipment and materials; e. The type of existing public infrastructure (street pavement, curb and gutter, sidewalks, or utilities) impacted by the construction, excavation, or work; f. The purpose of the proposed construction, excavation, or work, including specification of varieties and quantities of facilities to be placed in the right-of-way; g. The dates for beginning and ending the proposed construction, excavation, or work, including landscape restoration; h. Proposed hours of work. (2) Unless otherwise specified in an agreement between the permittee and the city, attach copies or otherwise show proof of all permits or licenses required under the laws of the United States, the State of Colorado, or the ordinances or regulations of the city to do the proposed work, and to work in the public rights-of-way (including required insurance, deposits, letters of credit, and warranties). (3) Unless otherwise specified in an agreement between the permittee and the city, provide a plan of work satisfactory to the director showing protection of the subject property and adjacent properties. (4) Unless otherwise specified in an agreement between the permittee and the city, upon request, provide a landscaping restoration plan satisfactory to the director for the protection of existing landscaping. (5) Include written verification that all orders issued by the city to the applicant, requiring the applicant to correct deficiencies under previous permits issued under this chapter, have been satisfied. (6) Include with the application stamped engineering construction drawings or site plans for the proposed construction, excavation, or work, including exact locations of all ground-mounted appurtenances and manholes in and out associated with any underground facilities. (7) Include with the application a satisfactory traffic control and erosion protection plan for the proposed construction, excavation, or work, if applicable. (8) Include a statement indicating any proposed joint use or ownership of the facility; any existing facility or permit of the applicant at this location; any known existing facility or others with which the proposed installations might conflict; and the name, address, and telephone number of a representative of the applicant available to review proposed locations at the site. (9) Pay all applicable fees prescribed by this chapter. (10) Upon written request of the director, provide a notification plan for the notification of the public as to the nature and duration of the proposed work. (B) Applicants shall update any new information on permit applications within ten days after any change occurs. (C) Joint applications. Applicants may apply jointly for permits to work in public rights-of-way at the same time and place. Applicants who apply jointly for permits may share in the payment of the permit fee. Applicants must agree among themselves as to the portion each shall pay. (D) Permit fee. Before a permit is issued pursuant to this chapter, the applicant shall pay to the city a permit fee, which shall be determined in accordance with a fee schedule adopted by the city council by resolution. Fees will be reasonably related to the costs inherent in managing the public rights-of-way. As used in this chapter, these costs include, but are not necessarily limited to, verifying rights-of-way occupation, mapping rights-of-way occupations, inspecting job sites and rights-of-way restorations, administering this chapter, and costs relating to the degradation of the rights-of-way, i.e., the cost to achieve a level of restoration as determined by the city at the time the permit is issued. (1) The portion of the permit fee relating to degradation costs shall be as shown on the permit. (2) Any permit for temporary use or occupation of the public rights-of-way, where there is no construction nor excavation involved, shall not require payment of a degradation fee as part of the permit fee. (3) That portion of any permit fee relating to degradation costs shall be segregated by the city into an account to cover general street maintenance and construction.
(Ord. 1515 §1, 2000; Ord. 1951 §§4, 5, 2012)
Ask a question about Broomfield law
Corpus searches the Broomfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.