§ 14-10-180 — Construction and restoration standards for newly constructed or overlayed streets

Municipal Code of the City and County of Broomfield, Colorado (Codified through Ordinance No. 2304, adopted May 26, 2026 (Supp. No. 54)) · Broomfield Municipal Code § 14-10-180

Corpus is an independent public-information project, not the official City of Broomfield website. Stable reference: corpuslaw.us/code/bfedc254-bcac-40f4-be20-b879f34ede8e

14-10-180 - Construction and restoration standards for newly constructed or overlayed streets.

(A) No person shall cause an open trench or excavation in any public right-of-way for a period of five years from the completion of work allowed by the permit, or other construction or resurfacing except in compliance with the provisions of this section, and in accordance with standards and specifications adopted by the city, as amended. Potholing of utilities in the pavement will be allowed at the discretion of the director. (B) Application. Any application for a permit to excavate in a public right-of-way subject to the requirements of this section shall contain the following information: (1) A detailed and dimensional engineering plan that identifies and accurately represents the city rights-of-way or property that will be impacted by the proposed excavation, as well as adjacent streets, and the method of construction. (2) The street width or alley width including curb and gutter over the total length of each city block that will be impacted by the proposed excavation. (3) The location, width, length, and depth of the proposed excavation, and description of materials to be placed within the right-of-way. (4) The total area of existing street or alley pavement in each individual city block that will be impacted by the proposed excavation. (5) A written statement addressing the criteria for approval. (C) Criteria for approval. No permit for excavation in the right-of-way of new streets shall be approved unless the director finds that all of the following criteria have been met: (1) Boring or jacking without disturbing the pavement is not practical due to physical characteristics of the street or alley or other utility conflicts. (2) Alternative utility alignments that do not involve excavating the street or alley are found to be impracticable. (3) The proposed excavation cannot reasonably be delayed until after the five-year deferment period has lapsed. (4) Exemptions for emergency operations. Emergency maintenance operations shall be limited to circumstances involving the preservation of life, property, or the restoration of customer service. Persons with prior authorization from the city to perform emergency maintenance operations within the public rights-of-way shall be exempted from this section. Any person commencing operations under the laws of this section shall submit detailed engineering plans, construction methods, and remediation plans no later than three working days after initiating the emergency maintenance operation. (D) Construction and restoration for newly constructed or overlayed streets and alleys. The streets shall be restored and repaired in accordance with design and construction standards adopted by the city, as amended, and guaranteed in accordance with section 14-10-090, B.M.C.

(Ord. 1515 §1, 2000)