For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 18.12.050 — Alteration of watercourse

Municipal Code of the Town of Castle Rock, Colorado (Codified through Ordinance No. 2026-014, enacted May 5, 2026 (Supp. No. 63)) · Castle Rock Municipal Code § 18.12.050

Corpus is an independent public-information project, not the official City of Castle Rock website. Stable reference: corpuslaw.us/code/980d1ba0-bd2f-44c7-ab19-bcf76b045a02

18.12.050 - Alteration of watercourse.

The following provisions are considered minimum standards for compliance with this Title. For further regulations related to alteration of watercourses, refer to the Town of Castle Rock Storm Drainage Design and Technical Criteria Manual, as amended. For all proposed developments that alter a watercourse within a Special Flood Hazard Area, the following standards apply: A. Any channelization or other watercourse alteration activity proposed by a project proponent must be evaluated for its impact on the regulatory floodplain and be in compliance with all applicable federal, state and local floodplain rules, regulations and ordinances. B. Any watercourse alteration activity shall be designed and sealed by a registered Colorado professional engineer or certified professional hydrologist. C. Watercourse alteration activities within the floodway fringe district are strongly discouraged and will only be considered on a case-by-case basis. A floodplain modification study consistent with the scope of the work must be provided. D. Watercourse alteration activities within the floodway district shall not be approved except under the following conditions: 1. The project proponent demonstrates through a floodplain modification study, including floodway analysis, sealed by a registered Colorado professional engineer, that there is not more than a 0.00-foot rise in the proposed conditions compared to existing conditions in the floodway resulting from the project, otherwise known as a no-rise certification. 2. Project proponents that propose to increase the water surface elevation of the floodway, having first demonstrated that no practicable alternatives exist to revising the boundaries of the floodway, must apply for a Conditional Letter of Map Revision (CLOMR) through FEMA, meet all requirements for such revisions as established under the provisions of 44 CFR Chapter 1, Section 65.12 of the NFIP Regulations and obtain FEMA approval. E. Watercourse alteration activities within Special Flood Hazard Areas for which a regulatory floodway has not been designated may be approved under the following conditions: 1. The project proponent demonstrates through a floodplain modification study that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the base flood more than one-half foot at any point within the community and certify that no structures are located in areas which would be impacted by the increased Base Flood Elevation. 2. Development applications that propose to increase the water surface elevation of the base flood by more than one-half foot must apply for a Conditional Letter of Map Revision (CLOMR) through FEMA, meet all requirements for such revisions as established under the provisions of 44 CFR Chapter 1, Section 65.12 of the NFIP Regulations and obtain FEMA approval. F. Channelization and flow diversion projects shall appropriately consider issues of sediment transport, erosion, deposition and channel migration and properly mitigate potential problems through the project, as well as upstream and downstream of any improvement activity. A detailed analysis of sediment transport and overall channel stability should be considered, when appropriate, to assist in determining the most appropriate design. G. Channelization and flow diversion projects shall evaluate the residual 100-year floodplain. H. A Letter of Map Revision (LOMR) or Letter of Map Revision Based on Fill (LOMR-F) shall be submitted within six months of completion of the watercourse alteration activity and approved by FEMA. I. Floodplain easements and maintenance shall be required for any altered or relocated portion of watercourses so that the flood-carrying capacity is not diminished.

(Ord. 2013-38 §1, 2013)

Ask a question about Castle Rock law

Corpus searches the Castle Rock sections it holds and shows the ones that match, with their citations. Free, no sign-in.