For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 18-3 — Construction permit required; application; fees; issuance; appeals

Fort Collins Municipal Code (Supp. No. 156, Update 2: codified through Ordinance No. 122, 2026, enacted September 15, 2026) · Fort Collins Municipal Code § 18-3

Corpus is an independent public-information project, not the official City of Fort Collins website. Stable reference: corpuslaw.us/code/a70c1731-473a-4bd1-8254-6a5436bef018

Sec. 18-3. - Construction permit required; application; fees; issuance; appeals.

(a) Permit Required. It shall be unlawful to develop, construct, alter or enlarge any mobile home park within the City without a valid permit issued by the Building Official for the specific development, construction, alteration or activity proposed. (b) Applications. All applications for permits shall be made in writing to the Building Official and shall contain the following: (1) Name and address of the applicant. (2) Name and address of the owner of the mobile home park. (3) Location and legal description of the mobile home park. (4) Complete plans and specifications of the proposed park (conforming with the requirements of this Article, the Land Use Code, utility design standards and street design standards as established by the City), including the following specific information: a. The area and dimensions of the tract of land. b. The number, location and size of all mobile home lots. c. The location, design and width of roadways and pathways. d. The location of service buildings and any other proposed structures. e. The location and size of water and sewer lines, riser pipes and fire hydrants, and the location and details of lighting and electrical systems. f. Identification of flood hazard areas and provisions for flood hazard reduction as may be required elsewhere in this Code. g. Complete landscaping plans identifying size and location of all plant materials, irrigation systems and ground coverings. h. Such further information as may be necessary to determine if the proposed park will comply with this Code. (c) Fees. All applications shall be accompanied by a fee equal to that set forth in the City building code as adopted in Chapter 5 of this Code. (d) Permit Issuance. When the activity as proposed in such application is determined to comply with the requirements of this Article and any regulations issued hereunder, and all other applicable City ordinances and regulations, a permit shall be issued. (e) Appeals. Any person whose application for a permit under this Article has been denied may request and shall be granted a hearing on the matter before the Building Review Commission under the procedure provided by this Article.

(Ord. No. 159, 1987, 10-20-87; Ord. No. 030, 2012, § 47, 4-17-12; Ord. No. 114, 2023, § 2, 9-19-23; Ord. No. 014, 2026, § 1, 3-3-26)

Ask a question about Fort Collins law

Corpus searches the Fort Collins sections it holds and shows the ones that match, with their citations. Free, no sign-in.