§ 26-317 — Monitoring facilities
Fort Collins Municipal Code (Supp. No. 156, Update 2: codified through Ordinance No. 122, 2026, enacted September 15, 2026) · Fort Collins Municipal Code § 26-317
Corpus is an independent public-information project, not the official City of Fort Collins website. Stable reference: corpuslaw.us/code/1fbdb609-6330-4f29-bec1-33166c4c7734
Sec. 26-317. - Monitoring facilities.
(a) Whenever required by the Utilities Executive Director, an industrial user shall provide, maintain and operate at its sole expense monitoring equipment and facilities sufficient to allow the safe inspection, sampling and flow measurements of the private sewer or internal drainage systems. The monitoring facility should normally be a monitoring manhole situated on the industrial user's premises, but the utility may, when such a location would be impractical or cause undue hardship on the industrial user, allow the facility to be constructed in the public street or sidewalk area and located so that it will not be obstructed by landscaping or parked vehicles. Whenever required by the Utilities Executive Director, a monitoring manhole shall be installed for each separate regulated discharge to the public sewer in accordance with plans and specifications approved by the Utilities Executive Director. The decision to require installation of monitoring equipment will consider factors such as sampling frequency, parameters, economics and physical limitations of the plant site. (b) There shall be ample room in or near the monitoring manhole or facility to allow accurate sampling and preparation of samples for analysis, and such manhole shall be safely, easily and independently accessible to authorized representatives of the utility during normal business hours. The Utilities Executive Director may require that the monitoring equipment be installed in an enclosed facility outside of the manhole. (c) Whether constructed on public or private property, the sampling and monitoring equipment and facilities shall be provided in accordance with the utility's requirements and all applicable local construction standards and specifications. Construction shall be completed within sixty (60) days following written notification by the Utilities Executive Director of the requirement for installation. (d) Each monitoring manhole shall contain a Palmer-Bowlus flume or similar device approved by the Utilities Executive Director with a recording and totalizing register for measurement of the liquid quantity. At the discretion of the Utilities Executive Director, the metered water supply to the industrial plant or a measurable adjustment thereof may be used to determine the liquid waste quantity.
(Code 1972, § 112-75(D); Ord. No. 166, 1986, § 1(112-135), 11-4-86; Ord. No. 130, 2002, § 33, 9-17-02; Ord. No. 020, 2010, § 5, 7-20-10; Ord. No. 080, 2011, § 1, 9-6-11)
Ask a question about Fort Collins law
Corpus searches the Fort Collins sections it holds and shows the ones that match, with their citations. Free, no sign-in.