§ 26-393 — Permission required for connection with electric utility, voltage variations and shortage of electricity
Fort Collins Municipal Code (Supp. No. 156, Update 2: codified through Ordinance No. 122, 2026, enacted September 15, 2026) · Fort Collins Municipal Code § 26-393
Corpus is an independent public-information project, not the official City of Fort Collins website. Stable reference: corpuslaw.us/code/1f7ecbd3-638d-4547-9b86-7819a1bd9220
Sec. 26-393. - Permission required for connection with electric utility, voltage variations and shortage of electricity.
(a) No person shall connect any wire, cord, socket, motor or other instrument, device or contrivance by which electricity may be transmitted or supplied to any lamp, globe, heating apparatus or other instrument by or at which electricity is or may be consumed, to any wire owned or operated by the City and constructed to transmit or supply electricity to any house or other building, without the consent of the electric utility. (b) Three-phase motors up to two hundred (200) horsepower may be supplied under applicable rate schedules, provided that such motors have been manufactured in accordance with National Electrical Manufacturers Association (NEMA) standards and further provided that suitable protection equipment and devices have been installed. (c) Utilities will be diligent in providing electric service with reasonable voltage variations. The customer shall be responsible and liable for voltage or quality variations caused by the customer's appliances and equipment, such as may be produced by starting motors, x-rays, welders, pumps, and other customer equipment or devices. If the customer desires to continue the operation of such equipment, utilities may require the customer to install motor generators, line filters, reactors, isolation transformers, or transformer and/or line capacity beyond that normally required, in order to eliminate the detrimental impact upon other customers. If such remedial measures involve expense on the part of utilities, all such costs shall be reimbursed by the customer. If the customer's demands are measured in such cases, utilities may determine the billing demands on shorter intervals than fifteen (15) minutes regardless of regular provisions in individual rates pertaining to the determination of billing demands. (d) Utilities will make reasonable efforts to furnish a continuous supply of electricity to meet demands. However, should shortages occur by reason of acts of God or causes beyond the immediate control of the utilities, utilities will have the right to grant preference to those present and future customers that in the opinion of the Utilities Executive Director are the most essential to the public welfare, based on information then available to the utilities. Utilities shall not be liable for damages, including monetary loss or loss of business from shortages in supply of electric energy. The customer shall be responsible for taking whatever precautions the customer shall deem appropriate to protect against damage or loss due to shortages in the supply of electricity.
(Code 1972, § 112-119; Ord. No. 60, 1993, § 3, 7-20-93; Ord. No. 066, 2016, § 6, 6-7-16)
Ask a question about Fort Collins law
Corpus searches the Fort Collins sections it holds and shows the ones that match, with their citations. Free, no sign-in.
