§ 26-396 — Use of meters required; damage to system prohibited, accuracy of meters
Fort Collins Municipal Code (Supp. No. 156, Update 2: codified through Ordinance No. 122, 2026, enacted September 15, 2026) · Fort Collins Municipal Code § 26-396
Corpus is an independent public-information project, not the official City of Fort Collins website. Stable reference: corpuslaw.us/code/126f16eb-4895-4445-b5a5-0ed486ed590e
Sec. 26-396. - Use of meters required; damage to system prohibited, accuracy of meters.
(a) No person shall take electrical energy from the distributing system except through a meter or other measuring device owned and installed by the City without the consent of the electric utility to take such electrical energy. All new construction shall be metered with a standard wirelessly communicating (AMI) meter, capable of being read remotely. (b) It shall be unlawful for the customer or any unauthorized person to tamper with, molest or damage directly or indirectly in any manner any part of the electrical system, or any City owned facilities, including meters. The customer shall be liable for any damage or loss to the property of the utilities or other persons and injury to utilities employees or other persons resulting from such unauthorized tampering or interference. (c) Meters measuring electric service shall be checked by utility for accuracy before installation and periodically thereafter on a scheduled or sample basis as determined by the utility. Meters shall be considered accurate when they measure within two (2) percent plus or minus when tested at one hundred (100) percent of full test current. The utility shall not keep in service a meter that registers usage under no load conditions.
(Code 1972, § 112-122; Ord. No. 60, 1993, § 3, 7-20-93; Ord. No. 066, 2016, § 7, 6-7-16; Ord. No. 164, 2018, § 5, 12-18-18)
Ask a question about Fort Collins law
Corpus searches the Fort Collins sections it holds and shows the ones that match, with their citations. Free, no sign-in.
