Sec. 26-474. - Residential electric development fees and charges.

(a) An Electric Capacity Fee ("ECF"), calculated as set forth in this Section and representing the cost to construct the electric distribution system infrastructure for a new or modified residential service shall be paid prior to the scheduling of any construction work required to provide said service. The ECF shall be determined based on the ECF charges in effect at the time of full payment. In the event of a customer request for revision to the system requirements for a new or modified service, construction of infrastructure improvements will cease until the customer has made payment in full of an updated ECF, including any increased construction costs associated with the revised system requirements; such increased amount, if any, shall be paid at the ECF rates in effect at the time it is paid in full. (b) The ECF shall be the total of the dwelling unit charge and systems modification charge, to be determined as follows: (1) The dwelling unit credit shall be as follows: For upgrade of an existing single-family panel size, to be applied against the applicable ECF charge below | $2,131 (2) The dwelling unit charge shall be as follows: a. Charge for a detached or attached single-family or multi-family panel size with two hundred (200) amp service | $2,683 b. Charge for a detached or attached single-family panel size with three hundred and twenty (320) amp service | $4,294 c. Charge for multi-family panel size with one hundred fifty (150) amp service, per dwelling unit | $1,885 (3) A system modifications charge will apply when a new or modified service will require infrastructure in addition to or different from the standard base electrical system model. The differential costs associated with such system modifications will be included in the calculated ECF. (c) The utility will schedule and commence construction of a new or modified electric service upon receipt of payment in full of the associated electric development fees, and per the Utility Installation Sequence as defined in the Electric Service Standards. If the utility is unable to commence construction when requested due to utility workload backlogs, the utility will schedule and commence the construction of new or modified electric service projects in the same order in which full payments are received. (d) A Building Site Charge ("BSC") for any new or modified residential service shall consist of the actual cost of construction, labor, materials, and equipment reasonably related to and required in providing electric services to the residential site. The BSC shall be reviewed and adjusted as provided in Section 26-473(b). (1) When any new or modified multi-family service requires extending primary circuitry to an on-site transformer, this component of the BSC charge shall be invoiced and paid in the same manner and at the same time as the ECF is invoiced and paid pursuant to § 26-474(a), and shall be the total of the primary circuit charge, transformer installation charge and any additional charges. The amounts shall be the same as the BSC for nonresidential development, as shown in § 26-475(d). (2) When any new residential service, on a previously undeveloped parcel, requires installation by the Utility of secondary service the BSC shall include a base secondary service charge (SSC) and linear foot charges, and shall be paid at the time of building permit based upon the current rates as of the time of issuance of the building permit. (3) The customer shall be responsible for secondary service installation and maintenance from the point of delivery to the service panel for multi-family dwellings. (4) Any single-phase residential service over two hundred (200) amps shall be considered a non-residential service.

(Ord. No. 154, 2003, § 11, 11-18-03; Ord. No. 135, 2005, § 2, 11-15-05; Ord. No. 175, 2006 § 1, 11-7-06; Ord. No. 123, 2007, § 1, 11-20-07; Ord. No. 113, 2008, § 1, 10-21-2008; Ord. No. 118, 2009, § 1, 11-3-09; Ord. No. 115, 2010, § 1, 11-16-10; Ord. No. 142, 2011, § 7, 11-1-11; Ord. No. 143, 2011, § 2, 11-1-11; Ord. No. 114, 2012, § 7, 11-6-12; Ord. No. 115, 2012, § 1, 11-6-12; Ord. No. 147, 2013, § 1, 11-5-13; Ord. No. 155, 2014, § 1, 11-4-14; Ord. No. 136, 2014, §§ 2—4, 12-2-14; Ord. No. 141, 2015, § 3, 11-17-15; Ord. No. 066, 2016, § 19, 6-7-16; Ord. No. 068, 2017, §§ 2, 3, 6-6-17; Ord. No. 131, 2019, §§ 2, 3, 11-19-19; Ord. No. 130, 2020, § 2, 11-17-20; Ord. No. 147, 2021, § 2, 11-16-21; Ord. No. 131, 2022, § 2, 11-15-22; 089, 2023, § 2, 7-18-23; Ord. No. 021, 2024, § 1, 2-20-24; Ord. No. 173, 2024, § 1, 12-3-24)