§ 12-191 — Definitions
Municipal Code of the City of Greeley, Colorado (Codified through Ordinance No. 16, 2026, enacted April 21, 2026 (Supp. No. 6, Update 1)) · Greeley Municipal Code § 12-191
Corpus is an independent public-information project, not the official City of Greeley website. Stable reference: corpuslaw.us/code/a665ae71-21c9-47c8-a2f6-6ca1039a5476
Sec. 12-191. - Definitions.
The following words, terms and phrases, when used in this chapter, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning: Common plan of development or sale means contiguous (within one-quarter mile of each other) multiple, separate and distinct construction activities that may be taking place at different times on different schedules, but remain related because they share the same builder, contractor, equipment or storage areas. Construction activities means clearing, grading, excavation, installing or improving roads, creating staging areas, stockpiling fill materials, borrow areas and compacting associated with stabilization of structures, but does not include routine maintenance performed by public agencies or their agents to maintain original line grade, hydraulic capacity or the original purpose of a facility. Construction site erosion and sediment control plan or CSESCP means a plan submitted to the city that addresses erosion, sediment and waste control and water quality issues pertaining to the site containing such information as site description, location and description of appropriate best management practices, as that term is defined in title 20, maintenance procedures and all other matters necessary or appropriate to comply with the provisions of this chapter and the City of Greeley Storm Drainage Design Criteria and Construction Specifications Manual. Final stabilization means the condition reached when all land disturbing activities at a development site have been completed, and a uniform vegetative cover has been established with an individual plant density of at least 70 percent of pre-disturbance levels or equivalent permanent physical erosion reduction methods have been employed. Land disturbing activity means an activity that results in a change in the existing surface, including, but not limited to, construction activities, but does not include tilling agricultural land. Stormwater means stormwater runoff, snow melt runoff and surface water runoff and drainage. SWMP (stormwater management plan) means a plan for receiving, handling and transporting stormwater within the city's stormwater drainage system.
(Code 1994, § 9.18.030; Ord. No. 37, 2012, § 1, 10-2-2012; Ord. No. 31, 2019, exh. A, § 9.18.030, 7-2-2019; Ord. No. 16, 2022, § 17(app. A, § 17), 4-19-2022)
Ask a question about Greeley law
Corpus searches the Greeley sections it holds and shows the ones that match, with their citations. Free, no sign-in.
