Sec. 12-200. - General requirements.
The following requirements must be met for land disturbing activity authorized pursuant to a grading permit: (1) All temporary erosion control facilities and all permanent facilities intended to control erosion shall be installed before any land disturbing activity takes place, if practicable. (2) Any land disturbing activity shall be conducted in such a manner so as to effectively reduce accelerated soil erosion and resulting sedimentation and should not exceed the erosion expected to occur for the area if undeveloped. (3) All persons engaged in land disturbing activity shall design, implement and maintain soil erosion and sedimentation control measures, in conformance with the erosion control technical standards adopted by the city contained in the Storm Drainage Design Criteria and Construction Specifications Manual and the Urban Drainage and Flood Control District's Urban Storm Drainage Criteria Manual. (4) All land disturbing activity shall be designed and completed in such a manner so that the change in existing land surface is limited to the minimum period of time. (5) Sediment caused by accelerated soil erosion shall be removed, to the maximum extent practicable, from runoff water before it leaves the area of the land disturbing activity. (6) Any temporary or permanent facility designed and constructed for the conveyance of water around, through or from the area of land disturbing activity shall be designed to limit the water flow to a nonerosive velocity. (7) Temporary soil erosion control measures shall be removed, and disturbed areas graded and stabilized with permanent soil erosion control measures pursuant to standards and specifications prescribed in accordance with the provisions of the SWMP, applicable regulations and the grading permit. (8) Permanent soil erosion control measures for all slopes, channels, ditches or any disturbed area shall be completed within 14 calendar days, depending on climate conditions, after final stabilization has been completed. When it is not possible to permanently stabilize an area after land disturbing activity has ceased, adequate temporary soil erosion control measures in compliance with the Storm Drainage Design Criteria and Construction Specifications Manual and the Urban Drainage and Flood Control District's Urban Storm Drainage Criteria Manual shall be implemented within 14 calendar days, depending on climate conditions. All temporary soil erosion control measures shall be maintained until permanent soil erosion measures are implemented.
(Code 1994, § 9.18.120; Ord. No. 15, 1996, § 1, 3-19-1996; Ord. No. 37, 2012, § 1, 10-2-2012; Ord. No. 31, 2019, exh. A, § 9.18.120, 7-2-2019)
Ask a question about Greeley law
Corpus searches the Greeley sections it holds and shows the ones that match, with their citations. Free, no sign-in.