Sec. 24-304. - Required improvements.
a. Intent. The intent of this section is to: 1. Ensure that all improvements necessary to serve lots within a subdivision are constructed, inspected or otherwise assured of completion prior to the issuance of permits and final approvals. 2. Prevent the location or design of a subdivision from placing an undue burden on public utility systems and community facilities serving other areas. 3. Provide appropriate apportionment of costs, and offset higher net costs or premature costs to the public resulting from subdivisions. 4. Protect against subdivisions where soil, subsoil or flooding conditions would create potential dangers to public health or safety. 5. Coordinate subdivisions and construction of required improvements with other anticipated improvements or with future growth. b. Timing of improvements. All required improvements shall be provided in one of the following ways: 1. Construction prior to building permit. Improvements may be constructed and certified record drawings of as-built shall be submitted to the city and certified that it was built as shown and to city specifications by: (a) The contractor; (b) The project surveyor; and (c) The project engineer. 2. Financial guarantee. The applicant may defer any improvements by submitting a financial guarantee for 125 percent of the total cost of improvements based on approved design or construction plans. (a) The guarantee shall be in a form and for an amount acceptable by the city. (b) Any deferral of streets shall require all weather surfaces of concrete, asphalt or road base placed on the lip of the curb and gutter for interim access of construction and emergency vehicles. (c) All improvements for the particular phase of the plat shall be installed prior to a certificate of occupancy for any part of the phase. (d) Upon submittal and acceptance of as-built drawings for the improvements, the city may release the financial guarantee, but retain 20 percent for the two-year warranty period. 3. Subdivision improvement agreement. The city and the applicant may enter into a subdivision improvement agreement recorded in association with an approved plan that more specifically defines the type, timing, and guarantees for required improvements. c. Required improvements. The following improvements and plans are required for all subdivisions. All improvements are subject to the city or other responsible entities' standards, plans, and specifications for improvements. 1. Survey monuments; 2. Sanitary sewer main lines and service lines to each lot; 3. Water main lines and service lines to each lot; 4. All non-potable mains and services to required lots; 5. Fire hydrants; 6. Storm sewers, culverts, detention facilities, bridges and any other approved storm drainage components, or elements required by a stormwater management plan; 7. Dust abatement and erosion control plan; and 8. Perimeter treatment landscape plan. 9. Utilities (telephone, electrical service, gas lines and cable television). All utilities shall be installed underground and be in place prior to any postponed street or alley surfacing. Above-ground facilities necessarily appurtenant to underground facilities or other installation of peripheral overhead electrical transmission and distribution feeder lines or other installation of either temporary or peripheral overhead communications, distance, trunk or feeder lines may be above ground. No curb, gutter or sidewalk shall be installed until all utilities are provided. 10. Streets, alleys and sidewalks. All streets shall be paved and all other improvements such as sidewalk, bike paths, curb and gutter shall be installed as required. In cases where an existing street has not been brought up to city specifications the street shall be paved and all other improvements such as sidewalk, bike paths, curb and gutter shall be installed in order to meet city specifications. If any subdivision is located adjacent to any existing street right-of-way, the applicant shall improve at least the adjacent half of the street according to city specification. 11. Street signs (on residential projects only); 12. Street lights; 13. All other improvements required as a condition of approval of the plat or contained within the subdivision improvement agreement shall be completed. d. Procedures for improvements. To ensure that all required improvements are built according to city specifications, the construction process shall generally take the following steps: Table 24-3-9: Procedures for Improvements Step 1: Construction permit application | • Plans and specifications, submitted by the applicant. • Warranty for improvements submitted per section 24-304.e. • Staff review and scheduling of pre-construction coordination meeting. Step 2: Construction permit issued | • Release of grading permits. • Release of ROW permits. Step 3: Initial inspection | • Permittee notifies the city of completion of construction as permitted. • As-built drawings submitted by the permittee, certified by the contractor, surveyor and project engineer. Any major changes to the as-built drawings shall be reflected and recertified prior to final acceptance. • City inspects and issues a punch list for any necessary deficiencies or maintenance. • If no punch list items, or after punch list completed, preliminary acceptance by the city and certificate of substantial completion issued. • City maintenance begins, but permittee financial responsibility for defects, maintenance and repairs continues. • Two-year warranty period begins. Step 4: Intermediate inspection | • Option of the city. • Any point at least 120 days prior the expiration of warranty period. Step 5: Final inspection (30—60 days prior to expiration of warranty period) | • Permittee submits request for final acceptance certificate. • Punch list issued for any outstanding items to be completed before end of the 2-year warranty. • If no deficiencies identified, final acceptance certificate issued. • Release of warranty authorized (unless cash deposit option used, which is nonrefundable). e. Warranty. All public improvement infrastructure, perimeter landscaping treatment improvements and common area improvements shall provide a two-year warranty period covering design and construction defects. 1. Warranty shall be one of the following, at the option of the permittee and subject to approval of the form by the city: (a) Warranty bond for 20 percent of total construction cost of required improvements. (b) Letter of credit for 20 percent of total construction cost of required improvements. (c) Cash deposit for one percent of total construction cost of required improvements that is nonrefundable. A cash deposit is an administration fee and shall not be construed as creating any type of insurer/insured relationship or subject the city to the provisions of C.R.S. title 10. 2. The warranty amount shall be based on an estimate provided by the applicant, or the director may determine an alternate amount based on relevant similar projects and comparable improvements. 3. The city may approve the construction permit in clearly defined, logical phases of construction, and may accept the apportioned warranty prior to the beginning of each phase. 4. The use of the warranty shall be restricted for the repair, replacement, completion and maintenance of all improvements subject to the construction permit, including detention facilities, perimeter landscaping and open space. 5. If the city uses any of the warranty, the permittee shall replace that amount used prior to being issued any new construction permits, either for the affected specific project or any other projects in which the permittee has an interest. 6. The city may extend the two-year warranty for all or a portion of the amount if major items have not been repaired/replaced to the city's satisfaction. 7. At least once each year, the city engineer shall review the use of all cash payment funds received by the city pursuant to this section. After review, the city engineer shall report to the city manager and city council, and make recommendations regarding the cash payment fund including transfers of fund balances to the General Fund. 8. After final inspection and final acceptance, and at the end of the two-year warranty period, the city shall release the permittee from any warranty bond or letter of credit. If the warranty is by cash deposit, this amount is not refundable.
(Ord. No. 35, 2021, § 2(app. A, § 2), 9-21-2021)
Ask a question about Greeley law
Corpus searches the Greeley sections it holds and shows the ones that match, with their citations. Free, no sign-in.