For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 24-305 — Adequate public facilities

Municipal Code of the City of Greeley, Colorado (Codified through Ordinance No. 16, 2026, enacted April 21, 2026 (Supp. No. 6, Update 1)) · Greeley Municipal Code § 24-305

Corpus is an independent public-information project, not the official City of Greeley website. Stable reference: corpuslaw.us/code/fc43b61e-67ee-4e12-8e1a-2500201f4123

Sec. 24-305. - Adequate public facilities.

a. Intent. The intent of the adequate public facilities standards is to: 1. Anticipate and evaluate the incremental and long-term impact of development on broader public and community facility needs. 2. Identify opportunities to integrate plans for public and community facilities into the planning and design of proposed land divisions. 3. Consider the location of public and community facilities in coordination with the initial planning considerations for streets, open spaces, blocks, and lots, so that needed facilities are appropriately located prior to the premature commitment of these areas to conflicting development patterns. 4. Ensure that public facilities needed to serve new development are available concurrent with development, and maintain service levels in existing areas as new development occurs. 5. Apportion appropriate costs for the impact of new development on existing and planned public facilities. 6. Provide the opportunity to negotiate implementation of public or community facilities beyond the impact of the particular project, where the lack of facilities may otherwise constrain potential future development. 7. Promote fiscal responsibility for all public entities by coordinating the planning, design and financing of public facilities with the impact generated from proposed development. b. General requirements. 1. Public facility plans. Public facilities shall be provided consistent with the following adopted city documents: (a) Comprehensive plan; (b) Water, sewer, and non-potable water master plans; (c) Comprehensive stormwater master plans; (d) Transportation master plan; (e) Development fee study; (f) Parks, trails, and open space master plan; and (g) Other adopted documents related to city capital improvements. 2. Service area map. Available services shall generally mean existing services of standard sizes of public water and sewer mains. The city updates the existing service area map regularly. 3. Project impacts. Individual projects will be evaluated for adequacy based on specific studies provided by the applicant and accepted by the city that demonstrate: (a) The location of the proposed development relative to existing facilities and service; (b) The ability of the project to access those facilities and services; and (c) The capacity of existing facilities and services to serve the new project while maintaining acceptable levels of service for existing development. 4. Other provisions. (a) Finding of adequate facilities does not exempt the applicant from paying impact fees provided in section 24-305.d. (b) Nothing in this section shall limit the city from denying an application where it otherwise determines that adequate public facilities will not be in place concurrent with the application, despite the effect of any of the requirements or options provided in this section. (c) Nothing in this section shall prohibit any other public entity from establishing fees that apportion the appropriate contribution for the impacts on planning, design and land acquisition for facilities needed due to the development. c. Specific adequacy standards. In addition to being consistent with the public facility plans in section 24-305.b.1, adequacy of specific public facilities shall be evaluated as follows. City analysis and project-specific studies of the impact, demand and capacity of existing facilities will be required to make a final adequacy determination. 1. Fire. Fire service is considered adequate if the proposed development is located within a 1.38 mile radius of an existing, operational fire station. This requirement is based on the analysis that one fire station is needed for every 30,000 people generally living in a six-square-mile area, as applied in the comprehensive plan. Proposed developments including land uses that pose a high risk of fire may be subject to more stringent requirements. 2. Parks. Park facilities are considered adequate if the proposed development is located within a half-mile radius of a neighborhood park and within a one-mile radius of a community park, where the park is not separated from the proposed development by an expressway, facility or natural feature. Regional parks, trails, natural areas, or sports facilities are not included in the analysis unless they contain facilities equivalent to those available in neighborhood parks. 3. Police. Police service extends to the city limits and adequacy shall be determined according to call response times relevant to the proposed development location. 4. Sanitary sewer. Sewer facilities are considered adequate if the proposed development is connected to a sewer line that is eight inches or larger in diameter with sufficient system capacity as defined by the city. 5. Water. Water facilities are considered adequate if the proposed development has sufficient connection to existing water lines that are eight inches or larger in diameter with sufficient system capacity. 6. Stormwater. Stormwater facilities are generally considered adequate if the site can safely convey stormwater runoff to a regional stormwater detention facility with sufficient capacity as defined by the city. If the city determines that the proposed development cannot safely convey runoff to an adequate stormwater system, adequacy requirements shall be met with detention facilities constructed on site. 7. Transportation. Transportation facilities to support new development are generally considered adequate if the proposed development is connected to a collector or arterial road or expressway (or will be connected at the time the improved arterial or collector is constructed within the two-year budget cycle) constructed to an acceptable cross section with sufficient capacity to serve the development as defined by the city. d. Impact fees. To mitigate project impacts on city service systems beyond the improvements required in section 24-304, developers shall pay standard impact fees established by title 6, chapter 15 of this Code. 1. If the facility is currently inadequate, sub-standard, or not existing, the impact fee shall be paid at the time of final plat. For purposes of economic development, the city may defer the impact fees for commercial and industrial development until the time of a building permit. 2. Impact fees where adequate facilities are existing shall be paid at the time of building permit. 3. As an alternative to the fee, the city may accept the applicant constructing or upgrading of any facility to the standards of this section. 4. Exceptions. The city council may waive some or all requirements that the developer absorb the development costs identified through the adequacy analyses outlined above pursuant to chapter 12 of title 6 of this Code. e. Reimbursement agreements. Applicants constructing required improvements for the applicants' property, or other adequate public facilities to serve the applicants' project, may be required to oversize the facilities to serve areas larger than such applicants' project based on planned future facility for the city. The city may require the applicant to enter into reimbursement agreements established elsewhere in this Code and according to the policies and procedures of the department responsible for the facility. f. Dedication of land. The city may require the dedication of land to the city or other government entity with jurisdiction over public and community facilities, for parks, open space, public safety facilities, or other public or community facilities. 1. The requirement shall be based on an official master plan of the entity having jurisdiction over the facility identifying the general location and extent of the facility, or some other documented need for the facility that is available for public review. 2. The dedication must be included on the preliminary plat or a condition of approval of the preliminary plat. 3. Acceptance of the dedication shall be agreed to in writing by the entity having jurisdiction over the site or facility prior to approval of the final plat or through approval of the final plat if dedication is to the city. 4. Dedication of land for community facilities beyond the impact of the application may be credited to the required impact fees based on a detailed analysis and documentation showing costs of land.

(Ord. No. 35, 2021, § 2(app. A, § 2), 9-21-2021; Ord. No. 18, 2025, § 3, 6-3-2025)

Ask a question about Greeley law

Corpus searches the Greeley sections it holds and shows the ones that match, with their citations. Free, no sign-in.