§ 14.25.130 — Flood plain regulations
Municipal Code of Lakewood, Colorado (Supp. No. 15: codified through Ordinance No. O-2026-16, adopted April 27, 2026) · Lakewood Municipal Code § 14.25.130
Corpus is an independent public-information project, not the official City of Lakewood website. Stable reference: corpuslaw.us/code/706e0d2c-4b46-490c-bca7-beb564c63cb1
14.25.130 - Flood plain regulations.
A. Unless modified by other parts of this Ordinance, the following general Flood Plain Regulations shall be in force: 1. In areas of shallow indeterminate flooding: a. All new construction and substantial improvements of nonresidential and residential structures shall have the lowest floor, including basement, and electrical, heating, ventilation, plumbing, air conditioning equipment and other service facilities including ductwork, elevated above the highest adjacent grade at least one foot above the depth number specified in feet on the FIRM, or at least three feet if no depth number is specified, or one foot above the crown of the nearest street, whichever is higher. b. As an alternative for nonresidential structures only, the structure, including utility and sanitary facilities, can be completely flood-proofed to the level mentioned above. The walls and basement floor shall be completely waterproofed and they shall be built to withstand lateral and uplift water pressure. c. Adequate drainage paths around structures proposed on slopes are required to guide flood waters around and away from the structures. 2. In flood plain areas in which the 100-year base flood elevations are known: a. All new construction and substantial improvements of residential and nonresidential structures shall have the lowest floor, including basement, and electrical, heating, ventilation, plumbing, air conditioning equipment, and other service facilities including ductwork, elevated one foot above the 100-year base flood elevation as indicated in the Official Flood Studies. b. As an alternative for nonresidential structures only, the structure, including utility and sanitary facilities, can be completely flood-proofed one foot above the 100-year base flood elevation as indicated in the Official Flood Studies. The walls and basement floor shall be completely waterproofed and they shall be built to withstand lateral and uplift water pressure. 3. When flood-proofing is used for nonresidential structures, a registered professional engineer or licensed architect shall certify that the flood-proofing methods are adequate to withstand the flood pressures, velocities, impact and uplift forces, and other factors caused by the 100-year flood. A record of this certification shall be maintained on file with the building permit by the Building Official. The elevation to which the structure is flood-proofed (based on sea level) shall be attached to the certification. 4. In areas previously designated as flood hazard areas and removed from the regulatory flood plain by a Letter of Map Revision based on Fill (LOMR-F), all new construction and substantial improvements of residential and nonresidential structures shall have the lowest floor, including basement, and electrical, heating, ventilation, plumbing, air conditioning equipment, and other service facilities including ductwork, elevated one foot above the 100-year base flood elevation as it existed prior to the placement of fill. As an alternative for nonresidential structures only, the structure, including utility and sanitary facilities, can be completely flood-proofed to one foot above the 100-year base flood elevation as it existed prior to the placement of fill. 5. The use of levees for property protection, flood control and flood hazard mitigation shall not be considered unless other mitigation alternatives are not viable. A levee may provide some level of flood protection for existing development, but the regulatory flood plain will not be modified based on the levee. Levees shall under no circumstances be constructed for the primary purpose of removing undeveloped lands from mapped flood plain areas for the purpose of developing those lands. 6. All new individual manufactured homes, new manufactured home parks, expansions of existing manufactured home parks, and manufactured home parks where the repair, reconstruction or improvements of the streets, utilities and pads equal or exceed 50 percent of their value before the repair, reconstruction or improvement was commenced, are to be placed or substantially improved and be elevated on a permanent foundation such that the lowest floor of the manufactured home, electrical, heating, ventilation, plumbing, air conditioning equipment, and other service facilities including ductwork, are one foot above the 100-year base flood elevations as indicated in the Official Flood Studies, provide adequate surface drainage, be securely anchored to an adequately anchored foundation system in accordance with this Ordinance, and access for a hauler be provided. When manufactured homes are put on pilings, the lot must be large enough to have steps up to the manufactured home. The pilings must be reinforced if they are more than six feet high and they must be placed in stable soil on ten-foot centers or less. 7. Individual building permits shall be required for the placement of any manufactured homes anywhere in the flood plain. 8. All manufactured homes placed or substantially improved after the effective date of these regulations in the 100-year flood plain shall be installed using methods and practices which minimize flood damage. For the purposes of this requirement, manufactured homes must be elevated and anchored to resist flotation, collapse, or lateral movement. Methods of anchoring may include, but are not limited to use of over-the-top or frame ties to ground anchors. There shall be top ties at each corner with one mid-point tie on each side of manufactured homes shorter than 50 feet. Longer manufactured homes shall have two ties at intermediate points on each side. All parts of the anchoring system shall have a strength of 4,800 pounds. Additions to manufactured homes shall be anchored in the same way. 9. Recreational vehicles shall either (a) be on the site for fewer than 180 consecutive days, (b) be fully licensed and ready for highway use, or (c) meet the permit requirements and elevation and anchoring requirements for manufactured homes. 10. All land development proposals shall follow the guidelines for drainage studies outlined in the Engineering Regulations, Construction Specifications, and Design Standards adopted by the City Council of Lakewood, Colorado. B. The City of Lakewood will review all proposed development in the flood plain to verify appropriate permits have been obtained and to ensure compliance with Section 404 of the Federal Water Pollution Control Act Amendments of 1972, 33 USC 1334. C. The City of Lakewood will: 1. Require flood plain development permits for all new development and other activities such as filling, paving and dredging in the flood plain. The Flood Plain Administrator may require any information necessary to ensure the provisions of this Ordinance are met before the issuance of a flood plain development permit. 2. Require building permits for structures in the flood plain according to the adopted building code and this Ordinance. 3. Review all building permit applications to determine whether proposed building sites will be reasonably safe from flooding. If a proposed building site is in a flood hazard area, all new construction and substantial improvements (including the placement of prefabricated buildings and manufactured homes) shall be: a. Designed or modified and adequately anchored to prevent flotation, collapse, or lateral movement of the structure, resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy, b. Constructed with materials and utility equipment resistant to flood damage, c. Constructed by methods and practices that minimize flood damage, and d. Constructed with electrical, heating, ventilation, plumbing and air-conditioning equipment and other service facilities designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding. 4. Require every builder or developer to submit an elevation certificate from a registered land surveyor listing the lowest floor (including basement) of new and substantially improved structures within the 100-year flood plain. 5. Require that for all new construction and substantial improvements, fully enclosed areas below the lowest floor that are subject to flooding shall: a. have the interior grade elevation that is below base flood elevation no lower than two feet below the lowest adjacent exterior grade, b. have the height of the below-grade crawlspace, measured from the interior grade of the crawlspace to the top of the foundation wall, not exceed four feet at any point, c. have an adequate drainage system that allows floodwaters to drain from the interior area of the crawlspace following a flood, d. be anchored to prevent flotation, collapse, or lateral movement of the structure and be capable of resisting the hydrostatic and hydrodynamic loads, e. be constructed with materials and utility equipment resistant to flood damage, f. be constructed using methods and practices that minimize flood damage, g. be constructed with electrical, heating, ventilation, plumbing, air conditioning equipment and other service facilities that are designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding, and be designed to automatically equalize hydrostatic flood forces on exterior walls by allowing for the entry and exit of floodwaters. Designs for meeting this requirement must either be certified by a registered professional engineer or licensed architect or must meet or exceed the following minimum criteria: (1) A minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding shall be provided. (2) The bottom of all openings shall be no higher than one foot above the exterior grade. (3) Openings may be equipped with screens, louvers, or other coverings or devices provided that they permit the automatic entry and exit of floodwaters. 6. Review subdivision proposals and other proposed new development (including proposals for manufactured home parks and subdivisions) to determine whether such proposals will be reasonably safe from flooding. The proposals shall include base flood elevation data submitted with subdivision proposals and other proposed developments greater than 50 lots or five acres, whichever is less. If a subdivision proposal or other proposed new development is in a flood hazard area, any such proposals shall be reviewed to assure that: a. All such proposals are consistent with the need to minimize flood damage within the flood hazard area, and b. No new lots are created in residential zone districts that are bisected by the main channel of a drainageway such that the lot contains property on both sides of the channel, and c. All public utilities and facilities, such as sewer, gas, electrical and water systems are located and constructed to minimize or eliminate flood damage, and d. Adequate drainage is provided to reduce exposure to flood hazards. 7. Require within flood hazard areas: a. New and replacement water supply systems to be designed to minimize or eliminate infiltration of flood waters into the systems, and b. New and replacement sanitary sewage systems to be designed to minimize or eliminate infiltration of flood waters into the systems and discharge from the systems into flood waters, and c. On-site waste disposal systems to be located to avoid impairment to them or contamination from them during flooding, and d. The cumulative effect of any proposed development, when combined with all other existing and anticipated development, shall not increase the water surface elevation of the base flood more than six inches at any point.
(Ord. O-2013-1 § 2, 2013).
Ask a question about Lakewood law
Corpus searches the Lakewood sections it holds and shows the ones that match, with their citations. Free, no sign-in.
