For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 14.25.150 — Floodway use permits

Municipal Code of Lakewood, Colorado (Supp. No. 15: codified through Ordinance No. O-2026-16, adopted April 27, 2026) · Lakewood Municipal Code § 14.25.150

Corpus is an independent public-information project, not the official City of Lakewood website. Stable reference: corpuslaw.us/code/3f519128-dc97-44c9-b85c-f7ad96c6bff0

14.25.150 - Floodway use permits.

A. The following uses may be permitted within a floodway upon approval of a Floodway Use Permit to the extent that they are otherwise allowed by the zoning ordinance: 1. Any use or accessory use employing a structure; however, no structure which is designed for human habitation shall ever be allowed under any conditions in or above the floodway. 2. Parking, loading areas and other similar uses when located less than ten feet from the stream bank. If a Floodway Use Permit is granted, 18-inch × 24-inch signs shall be posted listing depth of water in a base flood. Where interpretation is needed as to the exact location of the stream bank, the Flood Plain Administrator shall make the interpretation. 3. Privately-owned pedestrian or vehicular bridges not meeting the criteria for a permitted use outlined in Section 14.25.140. 4. Other uses similar in nature to those listed in items (1) through (3) above. B. Uses listed in this Ordinance as requiring a Floodway Use Permit may be established only after approval of a Floodway Use Permit by the Flood Plain Administrator. C. Standards relating to Floodway Use Permits in the floodway. 1. The base flood elevation (or flood protection elevation) is the water level for the 100-year flood assuming only that encroachment on the flood plain that existed when each Official Flood Study was adopted. Additional and complete encroachment to the floodway encroachment lines will cause the water level to surcharge six inches described above, assuming future complete encroachment to the floodway lines will occur. Consideration of the effects of a proposed use shall be based on a reasonable assumption that there will be an equal degree of encroachment extending for a significant reach on both sides of the stream. If the floodway is delineated in any of the Official Flood Studies, no further encroachment will be allowed unless the encroachment meets the provisions of this Ordinance. 2. Maintaining an unobstructed floodway capable of carrying the 100-year flood without surcharging water levels more than six inches at any point is an integral purpose of this Ordinance. As such, special conditions apply to Floodway Use Permits as follows: a. Any fill proposed to be deposited in the floodway must be shown to have some beneficial purpose and the amount placed shall not be greater than necessary to achieve the purpose demonstrated on a plan submitted by the applicant. Any fill or other materials shall be protected against erosion. b. Structures. Under no conditions shall structures in or above the floodway ever be designed for human habitation. Structures shall have a low flood damage potential and shall be constructed and located on the building site in a manner which minimizes obstruction of the flow of floodwaters. Whenever possible, structures shall be placed with the longitudinal axis of the structure parallel to the direction of the flood flow and structures shall be placed approximately on the same flood flow line as other adjacent structures. All structures shall have the lowest floor, including basement, elevated one foot above the 100-year base flood elevation as indicated in the Official Flood Studies or together with attendant utility and sanitary facilities, shall be flood-proofed one foot above the 100-year base flood elevation as indicated in the Official Flood Studies. A registered professional engineer or licensed architect shall certify that the flood-proofing methods are adequate to withstand the flood pressures, velocities, impact and uplift forces and other factors caused by the 100-year flood. c. Any structure allowed by a Floodway Use Permit shall be firmly anchored to prevent flotation, collapse or a lateral movement of the structure which may result in damage to other structures, restrictions of bridge openings or restrictions of narrow sections of the stream or river. d. The storage or processing of materials that are buoyant, flammable, explosive or could be injurious to human, animal, or plant life during times of flooding is prohibited under all conditions; however, storage of other materials or equipment may be allowed if not subject to major damage by floods and if firmly anchored to prevent flotation or if readily removable from the area within the time available after flood warning. D. Application for Floodway Use Permit. 1. Applications for Floodway Use Permits shall be considered by the Flood Plain Administrator. 2. The applicant shall submit application forms together with four sets of plans drawn to scale, showing the nature, location, dimensions and elevation of the lot, existing or proposed structures, fill, storage of materials, flood-proofing measures, and the relationship of the above to the location of the channel, floodway and 100-year base flood elevation as indicated in the Official Flood Studies. The applicant shall furnish the following additional information for the evaluation of the effects of the proposed use upon flood flows. a. Hydrologic and hydraulic analyses performed by a licensed Colorado Professional Engineer and in accordance with standard engineering practice, including profiles showing the slope of the bottom and top bank of the existing channel, existing 100-year water surface profile, slope of the bottom and top bank of the proposed channel and the proposed 100-year water surface elevation. b. Typical cross-sections showing the channel of the drainageway, elevation of land areas adjoining each side of the channel, cross-sectional areas to be occupied by the proposed development, and high water information c. Plan view showing elevations or contours of the ground; pertinent structures, fill, or storage elevations; size, location and special arrangement of all proposed and existing structures on the site; location and elevations of streets, water supply, sanitary facilities, photographs showing existing land uses and vegetation upstream, soil types, flood plain and floodway boundaries, and other pertinent information. d. Specifications for building construction and materials, flood-proofing, filling, dredging, grading, channel improvements, storage of materials, water supply, and sanitary facilities. e. Additional information as may be required. 3. In making a determination on an application for a Floodway Use Permit, the Flood Plain Administrator shall determine the specific flood hazard at the site and shall evaluate the suitability of the proposed use in relation to the flood hazard. The application shall be submitted to the Urban Drainage and Flood Control District for review and a recommendation to the Flood Plain Administrator. In addition, the Flood Plain Administrator shall consider the following factors, although not limited to such factors. (a) The probability that materials may be swept onto other lands or downstream to the injury of others. (b) The danger to life and property due to flooding or erosion damage. (c) The susceptibility of the proposed facility and its contents to flood damage and the effect of such damage to the individual owner. (d) The importance of the services provided by the proposed facility to the community. (e) The availability of alternative locations not subject to flooding for the proposed use. (f) The compatibility of the proposed use with the existing and anticipated development. (g) The relationship of the proposed use to the comprehensive plan and flood plain management program for that area. (h) The safety of access to the property in times of flood for ordinary and emergency vehicles. (i) The expected heights, velocity, duration, rate of rise and sediment and debris transport of the floodwaters expected at the site. (j) The costs of providing governmental services during and after flood conditions, including maintenance and repair of public utilities and facilities such as sewer, gas, electrical, water systems, streets and bridges. (k) The proposed water supply and sanitation systems and the ability of these systems to prevent disease, contamination and unsanitary conditions. E. Appeal of the Flood Plain Administrator's Decision. 1. The applicant may appeal the Flood Plain Administrator's decision on a Floodway Use Permit to the Planning Commission. 2. A written appeal, outlining the reasons for the appeal, shall be submitted to the Secretary to the Planning Commission within 30 days of the Flood Plain Administrator's decision. The appeal application shall include all items listed in Section 14.25.150 and any other additional information as may be required. 3. The Planning Commission shall conduct a public hearing within 30 days of receipt of a complete application, or within a timeframe agreed upon by the applicant and Flood Plain Administrator. Notification shall be consistent with the Planning Commission public hearing notification requirements of the Zoning Ordinance. 4. The Planning Commission shall determine whether the decision of the Flood Plain Administrator is consistent with this Ordinance. The Planning Commission shall affirm, modify, or reverse the decision of the Flood Plain Administrator. Any decision of the Planning Commission shall include reasons for affirming, modifying, or reversing the Flood Plain Administrator's decision. 5. Any decision of the Planning Commission on review of an appeal of the Flood Plain Administrator's decision may be appealed to Jefferson County District Court.

(Ord. O-2013-1 § 2, 2013).

Ask a question about Lakewood law

Corpus searches the Lakewood sections it holds and shows the ones that match, with their citations. Free, no sign-in.