Sec. 14.08.340. - Monitoring facilities.
A. Whenever required by the director, an industrial user shall provide, maintain and operate, at its sole expense, monitoring equipment and facilities sufficient to allow the safe inspection, sampling and flow measurements of the user's private sewer or internal drainage systems based on the finding that compliance with standards of this chapter reasonably requires such equipment or facilities. All devices used to measure wastewater flow and quality shall be calibrated as required by the manufacturer to ensure accuracy. Plans and specifications for the monitoring facilities shall be approved by the director prior to construction of such facilities. The monitoring facilities will normally be a monitoring manhole situated on the industrial user's premises, but the control authority may, when such a location would be impractical or cause undue hardship on the industrial user, allow the facility to be constructed in the public street or sidewalk area, located so that it will not be obstructed by landscaping or parked vehicles. B. Whenever required by the director, a monitoring manhole shall be installed for each separate regulated discharge to the public sewer. The decision to require installation of monitoring facilities will consider factors such as sampling frequency, sampling parameters, economics, physical limitations of the plant site, and the requirements of state and federal regulations. There shall be ample room in or near the monitoring manhole or facilities to allow accurate sampling and preparation of samples for analysis, and the manhole or facilities shall be safely, easily and independently accessible to authorized representatives of the city at any time. The director may require that the monitoring equipment be installed in an enclosed facility outside the manhole. Whether constructed on public or private property, the sampling and monitoring equipment and facilities shall be provided in accordance with the control authority's requirements and all applicable local construction standards and specifications. Construction shall be completed within 60 days following written notification by the director of the requirement for installation. Federal regulations applicable to a specific industry may require the installation of monitoring facilities at points within the industrial treatment facilities. C. Whenever required by the director the monitoring facilities shall contain a Palmer-Bowlus flume or similar flow-measuring device with a flow recorder and totalizer for measuring and recording the discharge flow. The flow-measuring device and the measuring and recording equipment and methods shall be approved by the director. The flow-monitoring devices and associated equipment shall be accurate to within ten percent of the actual flow being discharged. At the request of the director, the discharger must be able to show proof, to the satisfaction of the director, of the accuracy of any flow-measuring device and the accuracy and applicability of the measurement and recording methods being used. D. Whenever the director finds it necessary for identification of discharges which may not be compatible with the operation of the POTW, the monitoring facilities shall contain a pH meter with a recorder for measuring and recording the discharge pH. The pH meter, equipment, recorder and methods must be approved by the director as accurately measuring and documenting pH. The discharger shall maintain and calibrate the pH meter and equipment per the manufacturer's recommendation and at the expense of the discharger. At the request of the director, the discharger must show proof, to the satisfaction of the director, of the accuracy of the pH meter and the accuracy and applicability of the measurement and the recording methods being used.
(Code 1993, § 14.08.340; Code 2009, § 14.08.340; Ord. No. O-87-42, § 1; Ord. No. O-92-17, § 1; Ord. No. O-98-15, § 12; Ord. No. O-2000-51, § 3; Ord. No. O-2007-78, § 22(14.08.340); Ord. No. O-2013-07, § 8, 3-19-2013)
Ask a question about Longmont law
Corpus searches the Longmont sections it holds and shows the ones that match, with their citations. Free, no sign-in.