For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 14.08.341 — Sampling and analysis requirements

Code of Ordinances of the City of Longmont, Colorado (Codified through Ordinance No. O-2026-39, enacted June 23, 2026 (Supp. No. 9)) · Longmont Code of Ordinances § 14.08.341

Corpus is an independent public-information project, not the official City of Longmont website. Stable reference: corpuslaw.us/code/c653134a-1861-4705-b244-ec4b8e0d7fc7

Sec. 14.08.341. - Sampling and analysis requirements.

A. Sample types, measurements and analyses required for each industrial user shall be determined by the director and included in the industrial user's discharge permit. All measurement, tests and analyses of characteristics of water and wastes to which reference is made in this chapter or in a discharge permit issued under this chapter shall be in accordance with procedures established by the EPA pursuant to section 304(h) of the Act and contained in 40 CFR 136, as amended. If 40 CFR 136 does not contain sampling or analytical techniques for the pollutant in question, or where the EPA determines that the part 136 sampling and analytical techniques are inappropriate for the pollutant in question, sampling and analyses shall be performed by using validated analytical methods or any other applicable sampling and analytical procedures, including procedures suggested by the control authority or other parties approved by EPA. All sampling, measurements and analyses done for satisfaction of the requirements of the permit shall be the responsibility of the industrial user or a designated representative of the user. All samples taken of permitted discharges must be reported to the control authority whether or not they are required by a permit. The wastewater discharge amount shall be measured using either the flow measurement device installed per section 14.08.340, or, at the discretion of the director, the metered water supply to the industrial user's facility (or measurement adjustment thereof). B. All samples must be representative of the industrial user's discharge and shall be collected during the monitoring period. Wastewater monitoring and flow measurement facilities shall be properly operated, kept clean and maintained in good working order at all times. The failure of a user to keep its monitoring facilities in good working order shall not be grounds for the user to claim that sample results are unrepresentative of its discharge.

(Code 1993, § 14.08.341; Code 2009, § 14.08.341; Ord. No. O-87-42, § 1; Ord. No. O-92-17, § 1; Ord. No. O-2007-78, § 23(14.08.341))

Ask a question about Longmont law

Corpus searches the Longmont sections it holds and shows the ones that match, with their citations. Free, no sign-in.