§ 12.16.150 — Joint planning and construction; coordination of excavations

Municipal Code of the City of Loveland, Colorado (Codified through Ordinance No. 6832, enacted June 2, 2026. (Supp. No. 14)) · Loveland Municipal Code § 12.16.150

Corpus is an independent public-information project, not the official City of Loveland website. Stable reference: corpuslaw.us/code/7978c6a0-aa84-438b-91a4-4e5b676f5086

12.16.150 - Joint planning and construction; coordination of excavations.

A. Any permittee owning, operating, or installing in the rights-of-way facilities in providing water, sewer, gas, electric, communication, video, or other utility services shall meet annually with the director, at the director's request, to discuss the permittee's excavation master plan. At such meeting, to the extent not already in possession of the city, the permittee shall submit documentation, in a form required by the director, showing the location of the permittee's existing facilities in the city rights-of-way. The permittee shall discuss with the director its excavation master plan and identify planned major excavation work in the city. The director may make his own record on a map, drawing, or other documentation of each permittee's planned major excavation work in the city; provided, however, that no such document prepared by the director shall identify a particular entity, or the planned major excavation work of that particular entity. The permittee shall meet with the director to discuss an initial excavation master plan no later than 60 days after submitting its first permit application. Thereafter, each permittee shall submit annually, on the first regular business day of January, a revised and updated two-year excavation master plan. Such revised and updated plan shall be submitted in both hard copy and digital format. As used in this subsection, the term "planned major excavation work" refers to any future excavations planned by the permittee when the excavation master plan or update is submitted that will affect any right-of-way for more than five days, provided the permittee shall not be required to identify future major excavations planned to occur more than three years after the date that the permittee's master plan or update is discussed. Between the annual meetings to discuss planned major excavation work, the permittee shall use its best efforts to inform the director of any substantial changes in the planned major excavation work discussed at the annual meeting. B. The director shall prepare a two-year repaving plan showing the street resurfacing planned by the city. For purposes of this section, the repaving plan shall include a landscaping or other right-of-way improvement plan. The repaving plan shall be revised and updated on an annual basis after meeting to discuss the permittee's and city department's master plans and updates. The director shall make the city's repaving plan available for public inspection. In addition, after determining the street resurfacing work that is proposed for each year, the director shall send a notice of the proposed work to all permittees that have had an annual meeting with the director. C. In addition to the meeting described in Subsection A above, all permittees shall attend any meeting scheduled by the director, provided the permitee is given at least 30 days prior written notice.

(Ord. 5232 § 2, 2007)