§ 12.16.180 — Construction and restoration standards for newly-constructed and overlayed streets
Municipal Code of the City of Loveland, Colorado (Codified through Ordinance No. 6832, enacted June 2, 2026. (Supp. No. 14)) · Loveland Municipal Code § 12.16.180
Corpus is an independent public-information project, not the official City of Loveland website. Stable reference: corpuslaw.us/code/f5df0c38-4a3a-49f3-a2e5-0c8ef0ff3e87
12.16.180 - Construction and restoration standards for newly-constructed and overlayed streets.
No person shall cause an open trench excavation or potholing of utilities in the pavement of any right-of-way for a period of three years from the completion of construction or resurfacing except in compliance with the provisions of this section. A. Any application for a permit to excavate in a right-of-way subject to the requirements of this section shall contain the following information: 1. A detailed and dimensional engineering plan that identifies and accurately represents the rights-of-way or property that will be impacted by the proposed excavation, as well as adjacent streets, and the method of construction. 2. The street width or alley width, including curb and gutter, over the total length of each city block that will be impacted by the proposed excavation. 3. The location, width, length, and depth of the proposed excavation. 4. The total area of existing street or alley pavement in each individual city block that will be impacted by the proposed excavation. 5. A written statement addressing the criteria for approval. B. No permit for excavation in the right-of-way of new streets shall be approved unless the director finds that all of the following criteria have been met: 1. Boring or jacking without disturbing the pavement is not practical due to physical characteristics of the street or alley or other utility conflicts. 2. Alternative utility alignments that do not involve excavating the street or alley are found to be impracticable. 3. The proposed excavation cannot reasonably be delayed until after the three-year deferment period has lapsed. C. Emergency maintenance operations shall be limited to circumstances involving the preservation of life, property, or the restoration of customer service. Persons with prior authorization from the city to perform emergency maintenance operations within the rights-of-way shall be exempted from this section. Any person commencing emergency maintenance operations shall submit detailed engineering plans, construction methods, and remediation plans no later than three working days after initiating the emergency maintenance operation. D. A permittee may apply to the director for an exemption under this section when the construction is necessary in the public interest or to provide a public service. By way of example, but not by limitation, an exemption could be requested in order to provide services to a part of the city where no service would be available without construction. If a non-emergency exemption is granted to disturb a right-of-way within the three-year period, the director may, in his sole discretion, impose additional restoration requirements, including, but not necessarily limited to, repaving of a larger area, such as an entire block in which the construction occurs. E. The streets shall be restored and repaired in accordance with design and construction standards adopted by the city and guaranteed in accordance with Section 12.16.090.
(Ord. 5232 § 2, 2007)
Ask a question about Loveland law
Corpus searches the Loveland sections it holds and shows the ones that match, with their citations. Free, no sign-in.