§ 13.10.601 — Baseline monitoring reports
Municipal Code of the City of Loveland, Colorado (Codified through Ordinance No. 6832, enacted June 2, 2026. (Supp. No. 14)) · Loveland Municipal Code § 13.10.601
Corpus is an independent public-information project, not the official City of Loveland website. Stable reference: corpuslaw.us/code/102a59a8-2c16-4f58-8e0e-ccf8089f1985
13.10.601 - Baseline monitoring reports.
A. Within 180 days after the effective date of a categorical pretreatment standard, or the final administrative decision on a category determination under 40 C.F.R. 403.6(a)(4), whichever is later, existing categorical industrial users currently discharging to or scheduled to discharge to the POTW shall submit to the director a report that contains the information listed in Subsection B, below. At least 90 days prior to commencement of discharge, new sources, and sources that become categorical industrial users subsequent to the promulgation of an applicable categorical standard, shall submit to the director a report that contains the information listed in Subsection B, below. A new source shall report the method of pretreatment it intends to use to meet applicable categorical standards. A new source also shall give estimates of its anticipated flow and quantity of pollutants to be discharged. B. Industrial users described above shall submit the following information: 1. All information as may be required by Subsections 13.10.404.A.1 through 6, and 8. 2. Measurement of pollutants. a. The industrial user shall provide the information required in Subsections 13.10.404.A.7.a through d. b. The industrial user shall take a minimum of one representative sample to compile that data necessary to comply with the requirements of this subsection. c. Samples should be taken immediately downstream from pretreatment facilities if such exist or immediately downstream from the regulated process if no pretreatment exists. If other wastewaters are mixed with the regulated wastewater prior to pretreatment, the industrial user should measure the flows and concentrations necessary to allow use of the combined wastestream formula in 40 C.F.R. 403.6(e) to evaluate compliance with the pretreatment standards. d. Sampling and analysis shall be performed in accordance with Section 13.10.610. e. The director may allow the submission of a baseline report that utilizes only historical data so long as data provides information sufficient to determine the need for industrial pretreatment measures. f. The baseline report shall indicate the time, date, and place of sampling and methods of analysis, and shall certify that such sampling and analysis is representative of normal work cycles and expected pollutant discharges to the POTW. 3. Compliance certification. A statement, reviewed by the industrial user's authorized representative as defined in Section 13.10.104 and certified by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis, and if not, whether additional operation and maintenance and/or additional pretreatment is required to meet the pretreatment standards and requirements. 4. Compliance schedule. If additional operation and maintenance and/or additional pretreatment is required to meet the pretreatment standards and requirements, the shortest schedule by which the industrial user will provide such additional operation and maintenance and/or pretreatment must be provided. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. A compliance schedule pursuant to this section must meet the requirements set out in Section 13.10.602. 5. Signature and report certification. All baseline monitoring reports must be certified and signed by an authorized representative in accordance with Section 13.10.614.
(Ord. No. 6412, § 9, 8-18-2020)
Ask a question about Loveland law
Corpus searches the Loveland sections it holds and shows the ones that match, with their citations. Free, no sign-in.
