For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 22-312 — Floodplain development permit required

Code of the City of Thornton, Colorado (Supp. No. 65: codified through Ordinance No. 3773, adopted June 9, 2026) · Thornton City Code § 22-312

Corpus is an independent public-information project, not the official City of Thornton website. Stable reference: corpuslaw.us/code/a52223f4-ce89-4fb0-911c-49549702c4af

Sec. 22-312. - Floodplain development permit required.

(a) A floodplain development permit is required before construction or development begins within any area of special flood hazard established under Section 22-303. In addition, any application for any development permit on a parcel which has special flood hazard area shown on any portion of the parcel shall be evaluated to determine whether it involves the area of special flood hazard, and if so, it shall be reviewed under the provisions of this division. (b) The development activity and permit review processes established in Chapter 18, as amended by the provisions of this division, shall be used to review construction and development proposals located within areas of special flood hazard. (c) In addition to the submission requirements for development activity and applicable permits as required by Chapter 18, the following information is required when an area of special flood hazard is involved: (1) The elevation, in relation to the NAVD of 1988 or other applicable datum of the lowest floor (including basements) of all new and substantially improved structures. (2) The elevation in relation to the NAVD of 1988 or other applicable datum to which any nonresidential structure has been floodproofed. (3) The elevation in relation to the NAVD of 1988 or applicable datum or all electrical and mechanical equipment interior or exterior to a structure. (4) Certification by a registered Colorado professional engineer. The appropriate FEMA forms shall be used for certification of floodproofing methods. (5) A description of the extent to which any watercourse will be altered or relocated as a result of the proposed construction or development. (6) Evidence of permit approval from all necessary federal, state and regional agencies. (d) When base flood elevation data is not available for areas established under Section 22-303, the applicant shall obtain, review, and reasonably utilize any base flood elevation and floodway data available from a federal, state or other source as criteria for the administration of this division. Data obtained and utilized by the applicant shall be submitted to the development engineering manager. Such data shall be maintained by the floodplain administrator with the floodplain development permit.

(Ord. No. 3737, § 5, 8-12-25)

Ask a question about Thornton law

Corpus searches the Thornton sections it holds and shows the ones that match, with their citations. Free, no sign-in.