§ 62-60 — Definitions
Code of the City of Thornton, Colorado (Supp. No. 65: codified through Ordinance No. 3773, adopted June 9, 2026) · Thornton City Code § 62-60
Corpus is an independent public-information project, not the official City of Thornton website. Stable reference: corpuslaw.us/code/e6fe5348-24de-46fb-9f76-2c432521980f
Sec. 62-60. - Definitions.
The following words, terms and phrases, when used in this section, shall have the meanings ascribed to them in this subsection, except where the context clearly indicates a different meaning: Application fee means a non-refundable fee payable to the city by the initial developer for each category of infrastructure for which reimbursement is requested, which amount represents the reasonable costs incurred by the city in developing the reimbursement agreement. The application fee shall be as established in the fee resolution. Collection fee means a fee the city collects from the connector and represents the reasonable costs incurred by the city in collecting and disbursing the funds as set forth herein. The collection fee shall be as established in the fee resolution. Connection means a physical connection of any kind to the city infrastructure, except that connection of an existing property entrance to new street infrastructure constructed by an initial developer that is eligible for reimbursement shall not be considered a connection for the purposes of reimbursement until such time as the property use changes or improvements to the entrance are required as a result of development of the property as determined by the development engineering director. Connector means a party seeking to connect to the city infrastructure and who benefits from the infrastructure constructed by an initial developer that is eligible for the reimbursement procedure set forth in this section under criteria established by the city. Connector capacity means the capacity that the development engineering director, at his or her sole discretion, determines is required by the connector requesting connection to the infrastructure based on the typical demands as stated in the city's Standards and Specifications for the Design and Construction of Public Improvements as amended from time to time, the most current infrastructure master plans, and the final plat densities of the connecting properties. Construction cost means all costs associated directly and solely with the design and construction of the infrastructure which includes the costs of engineering, surveying, and testing, cost of permits and cash in lieu payments, costs of any rights-of-way (ROW) or easement acquisitions necessary for construction of the infrastructure, and costs of reasonable and necessary construction change orders. Administrative costs, which will include costs incurred by the initial developer for construction management including bidding, home office overhead, attorney's fees and all other expenses other than those direct expenses identified herein, shall not exceed five percent of the total direct construction costs for the infrastructure, all as detailed in a sworn affidavit from the initial developer. Drainage infrastructure includes, but is not limited to, collection system pipelines, inlets, box culverts, combination box culvert and pedestrian underpass, regional detention ponds, improved open channel conveyances and other appurtenances designed and constructed by the initial developer which are off site and, in the judgment of the development engineering director, are improvements that a connector would have been required to construct at the time of development of connector's property. Inflation factor means the amount the construction cost shall be adjusted for inflation for building costs in the Denver, Colorado, metropolitan area from the base period to the month of collection as determined by reference to the Construction Cost Index (CCI) for Denver, Colorado, published in the Engineering News Record. The base period CCI shall be the CCI most recently published prior to or on the date of initial acceptance of a project eligible for reimbursement. The CCI at time of collection shall be the CCI most recently published prior to or on the date of collection. Construction cost shall be adjusted by utilizing the base period CCI and the CCI at time of collection. The calculation is as follows: Inflation Factor = [CCI for date of collection]/[Base Period CCI] Initial developer means the party constructing or contracting for construction of infrastructure required by the city to provide service to a development. Property means lands which fall within the reimbursement agreement boundaries and which are owned or controlled by the subsequent connector which may include individual properties or subdivisions or as otherwise determined by the development engineering director. Street infrastructure includes, but is not limited to, pavement, subbase, over excavation, backfill, soil stabilization, recompaction, right-of-way costs, curbs, gutters, medians, landscaping, sidewalks, pedestrian underpasses, combination pedestrian underpass and box culvert, traffic signals, street lighting, bus pads, deceleration lanes, and other appurtenances as determined by the development engineering director, which are designed and constructed by the initial developer in accordance with the city's most current infrastructure master plans and the Standards and Specifications, and which are adjacent to the property that would derive benefit from use of or connection to the street infrastructure upon development of the property. Time of connection shall be when new infrastructure making a physical connection to the infrastructure receives initial acceptance from the city, or as otherwise determined by the development engineering director. Total capacity means the total capacity of the infrastructure as solely determined by the development engineering director and detailed in the initial developer's reimbursement application and incorporated into the reimbursement agreement. Wastewater infrastructure includes, but is not limited to, wastewater gravity systems, lift stations, force mains, and appurtenances designed and constructed by the initial developer which at the time of completion of construction by the initial developer could provide service to connectors. To qualify for reimbursement under this section, a lift station shall have been constructed to a capacity which the development engineering director determines is in excess of that reasonably required by the initial developer. Water infrastructure includes but is not limited to water transmission and distribution lines, all other water lines and related appurtenances larger than eight inches in diameter, and pressure reducing valves and booster pump stations which are sized to a capacity which the development engineering director determines is in excess of that required by the initial developer. Notwithstanding the above, the cost of constructing a booster pump station shall not be eligible for reimbursement when the development engineering director requires that a booster pump station be constructed to a capacity which is the minimum required by the Standards and Specifications.
(Ord. No. 2922, § 1, 10-25-05; Ord. No. 3648, § 7, 4-11-23)
Ask a question about Thornton law
Corpus searches the Thornton sections it holds and shows the ones that match, with their citations. Free, no sign-in.
