§ 62-63 — Reimbursable costs for wastewater infrastructure

Code of the City of Thornton, Colorado (Supp. No. 65: codified through Ordinance No. 3773, adopted June 9, 2026) · Thornton City Code § 62-63

Corpus is an independent public-information project, not the official City of Thornton website. Stable reference: corpuslaw.us/code/5c148ff8-a268-4124-9f89-5873b6d62938

Sec. 62-63. - Reimbursable costs for wastewater infrastructure.

The initial developer shall be reimbursed by connectors for wastewater infrastructure construction cost, as modified by the inflation factor, on the following basis: (1) The reimbursement amount for a connector shall be calculated by prorating the wastewater infrastructure construction cost by the percentage of the capacity required for the connector's property to the total capacity of the infrastructure based on the overall flow for the basin being served by each section of infrastructure. (2) Limitations on reimbursement amounts. a. In the event that a connector desires to connect to wastewater infrastructure and it is determined by the development engineering director that the subdivision plat for the connecting property will require less capacity than projected in the initial developer's reimbursement agreement, then the construction cost to be reimbursed, as modified by the inflation factor, shall be adjusted based on the projected flows required by the connector's subdivision plat and not based on the initial developer's projected capacity. The reimbursement amounts for the remaining properties not yet connected will not be changed from the amounts shown in the reimbursement agreement as a result of this event. b. In the event that a connector desires to connect to wastewater infrastructure and it is determined by the development engineering director that the subdivision plat for the connecting property will require more capacity than projected in the initial developer's reimbursement agreement, then the connector shall reimburse the initial developer for the construction cost, as adjusted by the inflation factor, originally projected by the initial developer's reimbursement agreement and not a higher amount based on the revised capacity required by the subdivision plat for the connector's property at the time of connection.

(Ord. No. 2922, § 1, 10-25-05)