For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 12.12.040 — Restoration after excavation

Bridgeport, Connecticut Municipal Code (Supp. No. 24, Update 2: codified through Ordinance dated July 6, 2026) · Bridgeport Municipal Code § 12.12.040

Corpus is an independent public-information project, not the official City of Bridgeport website. Stable reference: corpuslaw.us/code/af6fbfaf-f661-4edb-9d78-719f17db7f9d

12.12.040 - Restoration after excavation.

Whenever any opening or excavation shall be made in any street, highway, public alley or sidewalk, the contractor making such opening or excavation shall, as soon thereafter as practicable, thoroughly and competently fill in such opening or excavation and tamp and puddle the earth therein to a point four inches from the surface of the highway, so that the same shall not settle. The contractor shall fill the remaining four inches with adequate temporary paving materials, in the manner and with material prescribed by the director of public facilities. The contractor shall make all repairs as may be necessary to maintain such temporary paved surface in a safe condition and at the level of the surrounding areas for a period of six months. Within six months of the temporary patch, the contractor shall permanently resurface or repave the excavation area. If any such permanent paving shall not be timely and adequately performed, the director of public facilities shall make such repairs as are necessary to maintain safety and the contractor shall be liable for the costs of any such repairs. In lieu of a contractor completing a permanent resurface or repave, the director of public facilities may agree to accept payment from the contractor equal to the cost of installing said permanent paving. If funds are accepted from the contractor in lieu of paving, said funds will be deposited into the city's paving account to be expended on paving. With regard to all paving contemplated herein, testing may be required from the contractor by the city engineer. Failing test results, failure to conduct requested testing, or failure to supply testing results shall constitute a failure to conform to city standards and be subject to revocation of the permit and liability of the contractor for costs necessary to complete the paving.

(Ord. dated 8/5/24)

Ask a question about Bridgeport law

Corpus searches the Bridgeport sections it holds and shows the ones that match, with their citations. Free, no sign-in.