§ 12.12.070 — Notice and protection of obstructions and excavations
Bridgeport, Connecticut Municipal Code (Supp. No. 24, Update 2: codified through Ordinance dated July 6, 2026) · Bridgeport Municipal Code § 12.12.070
Corpus is an independent public-information project, not the official City of Bridgeport website. Stable reference: corpuslaw.us/code/129752ab-7288-4bf0-a44e-71b465d4ee13
12.12.070 - Notice and protection of obstructions and excavations.
Whenever any person shall have authority, under any contract with the city or under any permit authorizing the same, to remove the pavement or flagging from, excavate, occupy or use any part of the public streets so as to obstruct the travel in any street and to prevent the same from being used for the time being for the purpose of travel, such person shall erect in conspicuous positions, at the several points of intersection of such street so obstructed with the cross streets nearest to such obstruction, a suitable notice of such obstruction, which notice shall be in such manner and form as the director of public facilities may direct. It shall be the duty of every person engaged in digging into any street or highway, paving any street or section of a street, building any sewer or drain, digging any trench for gas pipes or water pipes, or digging and building any cistern or well in any of the public streets, under contract with the city or by virtue of any permission which may have been granted to him by the common council or the director, where such work, if left exposed, would be dangerous to users of such streets, to erect a fence or railing at such excavation or work in such a manner as to prevent danger to the users of such street, and to continue and uphold the railing or fence until the work shall be completed or the obstruction or danger removed. It shall also be the duty of such person to place upon such railing or fence, at twilight in the evening, suitable and sufficient cones, signs, barriers and lights and to keep such lights illuminated through the night. It shall be the duty of the director of public facilities and the police department to see that the provisions and requirements of this section, in regard to the erection of proper fencing or railings and the placing of proper lights thereon, are complied with and to report all violations thereof to the prosecuting attorney for prosecution. Every permit will require a Maintenance and Protection of Traffic (MPT) plan approved by the office of the city engineer. These plans will strictly follow the Manual of Uniform Traffic Control Devices (MUTCD). Failure to comply with these approved traffic plans will result in revocation of permit and immediate shut down of work within the Right-of-Way. The director of public facilities at his/her sole discretion will have the authority to enforce this shutdown and may designate the city engineer and License and Permit staff with the same authority. Contractors failing to adhere to this standard will be subject to revocation of license. Police officers administering traffic plans do not have authority to close a road without authorization of the director of public facilities or his/her designee.
(Ord. dated 8/5/24)
Ask a question about Bridgeport law
Corpus searches the Bridgeport sections it holds and shows the ones that match, with their citations. Free, no sign-in.
